IMPORTANT UPDATE: We are migrating to GCC 2.0. We have restricted new projects registration and further updates to migrated project. Please visit to GCC 2.0.

PROJECT DETAILS

Project Submission No. S01002
Project Title No.3 Solar Power Project in Delingha Solar Power Generation Application Leading Base
Project Owner(s) (as per PSF & LOA) Shenzhen Jinnuo Huantou Carbon Management Co., Ltd
Submission Date 2022-05-30
Global Stakeholder Consultation Period 2023-06-25 to
2023-07-09
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 135,535
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Country
 China
Focal Point of Project Owners
Shenzhen Jinnuo Huantou Carbon Management Co., Ltd
Email of Contact Person of FP (Primary) edward@junohtsz.com
Email of Contact Person of FP (Secondary) caixinbin@junohtsz.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

No.3 Solar Power Project in Delingha Solar Power Generation Application Leading Base (hereafter referred to as “the project”) is a solar power project with total installed capacity of 100MWp. The project is invested and operated by Delingha Xiechen Photovoltaic Power Co., Ltd. The project is located in Delingha photovoltaic (photothermal) Industrial Park, the West Exit of Delingha City, Qinghai Province, in China.

The project is connected to Northwest China Power Grid (NWCPG) and 

is expected to supply  an annual average 164,188.3 MWh of zero-emission electricity to NWCPG  in the 25-year project life time and an annual average of 173,920 of zero-emission electricity to NWCPG  during the fixed 10-year crediting period, which will displace power generation of those fossil fuel-fired power plants delivered to the NWCPG in the baseline scenario. The project is expected to achieve GHG emission reductions of 135,535 tCO2e annually. The total emission reductions during the fixed 10-year crediting period reaches 1,355,354 tCO2e.

The project is expected to contribute to 3 SDGs which are SDG 7, 8 and 13.

© 2026 Global Carbon Council