| Project Submission No. | S01002 |
|---|---|
| Project Title | No.3 Solar Power Project in Delingha Solar Power Generation Application Leading Base |
| Project Owner(s) (as per PSF & LOA) | Shenzhen Jinnuo Huantou Carbon Management Co., Ltd |
| Submission Date | 2022-05-30 |
| Global Stakeholder Consultation Period |
2023-06-25 to 2023-07-09 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Country |
China
|
|---|---|
|
Focal Point of Project Owners
|
Shenzhen Jinnuo Huantou Carbon Management Co., Ltd |
| Email of Contact Person of FP (Primary) | edward@junohtsz.com |
| Email of Contact Person of FP (Secondary) | caixinbin@junohtsz.com |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Project Brief | No.3 Solar Power Project in Delingha Solar Power Generation Application Leading Base (hereafter referred to as “the project”) is a solar power project with total installed capacity of 100MWp. The project is invested and operated by Delingha Xiechen Photovoltaic Power Co., Ltd. The project is located in Delingha photovoltaic (photothermal) Industrial Park, the West Exit of Delingha City, Qinghai Province, in China. The project is connected to Northwest China Power Grid (NWCPG) and is expected to supply an annual average 164,188.3 MWh of zero-emission electricity to NWCPG in the 25-year project life time and an annual average of 173,920 of zero-emission electricity to NWCPG during the fixed 10-year crediting period, which will displace power generation of those fossil fuel-fired power plants delivered to the NWCPG in the baseline scenario. The project is expected to achieve GHG emission reductions of 135,535 tCO2e annually. The total emission reductions during the fixed 10-year crediting period reaches 1,355,354 tCO2e. The project is expected to contribute to 3 SDGs which are SDG 7, 8 and 13. |
|---|