PROJECT DETAILS

Project Submission No. S00800
Project Title Havza Wind Power Project by Ekim Elektrik Mühendislik Müşavirlik İnşaat Turizm ve Ticaret A.Ş.
Project Owner (as per PSF & LOA) Ekim Elektrik Mühendislik Müşavirlik İnşaat Turizm ve Ticaret A.Ş. and Kıvanç Enerji Üretim A.Ş.
Submission Date 30 May 2022
Global Stakeholder Consultation Period 5 Jan 2023 - 19 Jan 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources– Version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 89,416 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Country Türkiye
Focal Point of Project Owners (FP)
Kıvanç Enerji Üretim A.Ş.
Email of Contact Person of FP (Primary) mehmet@kivanc.com
Email of Contact Person of FP (Secondary) mustafa.erdemir@kivanc.com
Email-id of External representative mehmet@kivanc.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project is a wind power plant project being represented by Ekim Elektrik Mühendislik Müşavirlik İnşaat Turizm ve Ticaret A.Ş. The project activity results in greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity is 48 MWe / 56 MWm. The average annual generated energy is expected to be 137,819 MWh and the project will be able to deliver a reduction in emissions of around 89,416 tCO2e (tons of carbon dioxide equivalent) per annum. Ekim Elektrik Mühendislik Müşavirlik İnşaat Turizm ve Ticaret A.Ş. is the sister company of Kıvanç Enerji Üretim A.Ş.

Additional Information