PROJECT DETAILS

Project Submission No. S00270
Project Title No.1 Solar Power Project in Delingha Solar Power Generation Application Leading Base
Project Owner (as per PSF & LOA) Shenzhen Jinnuo Huantou Carbon Management Co., Ltd
Focal Point of Project Owners*(FP)
Shenzhen Jinnuo Huantou Carbon Management Co., Ltd
Email of Contact Person of FP (Primary) edward@junohtsz.com
Email of Contact Person of FP (Secondary) caixinbin@junohtsz.com
Country P.R.China
Submission Date 30 May 2022
Global Stakeholder Consultation Period 26 Jul 2022 - 9 Aug 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 134,180
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG #7, #8
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

 No.1 Solar Power Project in Delingha Solar Power Generation Application Leading Base (hereafter referred to as “the project”) is a solar power project with total installed capacity of 100MWp. The project is invested and operated by Qinghai Huawo New Energy Co.,Ltd. The project is located in Delingha photovoltaic (photothermal) Industrial Park, the West Exit of Delingha City, Qinghai Province, in China.

The project is connected to Northwest China Power Grid (NWCPG) and 

is expected to supply  an annual average 162,546.4 MWh of zero-emission electricity to NWCPG  in the 25-year project life time and an annual average of 172,180.8 of zero-emission electricity to NWCPG  during the fixed 10-year crediting period, which will displace power generation of those fossil fuel-fired power plants delivered to the NWCPG in the baseline scenario. The project is expected to achieve GHG emission reductions of 134,180 tCO2e annually. The total emission reductions during the fixed 10-year crediting period reaches 1,341,801 tCO2e.

The project is expected to contribute to 3 SDGs which are SDG 7, 8 and 13.

Additional Information