PROJECT DETAILS

Project Submission No. S00269
Project Title Gonghe 100 MW Wind Power Project
Project Owner (as per PSF & LOA) Shenzhen Jinnuo Huantou Carbon Management Co., Ltd
Submission Date 30 May 2022
Global Stakeholder Consultation Period 26 Jul 2022 - 9 Aug 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 137,166 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Country China
Focal Point of Project Owners (FP)
Shenzhen Jinnuo Huantou Carbon Management Co., Ltd
Email of Contact Person of FP (Primary) edward@junohtsz.com
Email of Contact Person of FP (Secondary) caixinbin@junohtsz.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Gonghe 100 MW Wind Power Project (hereafter referred to as “the project”) is a wind power project with total installed capacity of 100MW. The project is invested and operated by Gonghe Chaidamu Energy Development Co., Ltd. The project is located in Dongke village and Taxiu village, Qieji Town, Gonghe County, Hainan Tibetan Autonomous Prefecture, Qinghai Province, China.

The project is connected to Northwest China Power Grid(NWCPG) and 

is expected to supply  176,012MWh of zero-emission electricity to NWCPG annually during the fixed 10-year crediting period, which will displace power generation of those fossil fuel-fired power plants delivered to the NWCPG in the baseline scenario. The project is expected to achieve GHG emission reductions of 137,166 tCO2e annually. The total emission reductions during the fixed 10-year crediting period reaches 1,371,660 tCO2e.

The project is expected to contribute to 3 SDGs which are SDG 7, 8 and 13.

Additional Information
VERIFICATION OUTCOME
Opinion

Shenzhen CTI International Certification Co., Ltd (CTI) has been commissioned by Shenzhen Jinnuo Huantou Carbon Management Co., Ltd. to perform the independent project verification of the GCC project activity: “Gonghe 100 MW Wind Power Project”. The objectives of this project verification is to verify that the GCC project meets the requirements of GCC project framework v2.1, GCC program manual v3.1, GCC program processes v4.0, GCC project standard v3.1, GCC project sustainability standard v3.1, GCC verification standard v3.1, GCC Environment & Social safeguards standard v3.0, ISO 14064-2 & ISO 14064-3, applicable approved CDM Methodology: ACM0002, version 20.0: Grid-connected electricity generation from renewable sources, Applicable Legal requirements/rules of host country, CORSIA requirements and other GCC requirements related to aspects such as project design, applicable conditions, project boundary, baseline scenarios, additionality, emission reduction, monitoring plan, local stakeholder consultation, global stakeholder consultation, GHG emission reductions (ACCs), environmental no-net harm label (E+), social no net harm label (S+), gold SDG label (SDG+), CORSIA+. This report summarizes the final project verification opinion which is based on Project Submission Form (version 03 dated14/03/2023).

The GCC project activity involved the construction and operation of Greenfield 100MW wind power plant in Dongke village and Taxiu village, Qieji Town, Gonghe County, Hainan Tibetan Autonomous Prefecture, Qinghai Province, China. The expected net annual average electricity generation of the project activity is approximately 176,012 MWh. The electricity thus generated will be sold to the Northwest China Power Grid. In the absence of the project activity, the equivalent amount of electricity would be supplied from GHG intensive grid. The emission reduction will be based on the amount of baseline electricity avoided due to the project and is calculated using the applied CDM Methodology: ACM0002, version 20.0: Grid-connected electricity generation from renewable sources.

The project verification team has verified that the information submitted by the project owner is correct and that the emission reduction achieved has been determined correctly. Based on the information seen and evaluated, the project verification team has requested for registration of the GCC by confirming the following:

Project title

Gonghe 100 MW Wind Power Project (project submission reference no: S00269)

Sectoral Scope and Methodology used

Sectoral Scope 1: Energy Industries (renewable/non-renewable sources)

ACM0002, version 20.0: Grid-connected electricity generation from renewable sources.

The Project Owner has correctly described the Project Activity in the Project Submission Form (version 03 dated 14/03/2023) including the applicability of the approved methodology and meets the methodology applicability conditions and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reductions estimates correctly and conservatively.

Estimated Emissions reductions

The Project Activity is likely to generate GHG emission reductions amounting to the estimated 137,166 tCO2e/year, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence

of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3.

Voluntary Certification Labels

The Project Activity is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and is likely to achieve the Environmental No-net- harm Label (E+) and Social No-net-harm Label (S+).

The Project Activity is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), complies with the Project Sustainability Standard, and contributes to achieving a total of 3 SDGs, with the Silver SDG certification label (SDG+)

CORSIA

The Project Activity complies with all the applicable requirements of the GCC Program and ICAO‘s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project.

 

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2023-07-26
© 2024 Global Carbon Council