Project Submission No. | S00579 |
---|---|
Project Title | Dulan Beikeliang 49.5MW Wind Power Project |
Project Owner(s) (as per PSF & LOA) | Gansu Ruicarbon Technology Consulting Co., Ltd |
Submission Date | 2022-05-28 |
Global Stakeholder Consultation Period |
2022-11-06 to 2022-11-20 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 21.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility |
Country |
China
|
---|---|
Focal Point of Project Owners
|
Gansu ruicarbon Technology Consulting Co., Ltd |
Email of Contact Person of FP (Primary) | gansuruicarbon@163.com |
Email of Contact Person of FP (Secondary) | rui_carbon@163.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Dulan Beikeliang 49.5MW Wind Power Project (“the project”) is a wind power project with total installed capacity of 49.5MW. The project is developed by SDIC Qinghai Wind Power Co., Ltd.. The project is located in Dulan County West, Qinghai Province, P. R. China. The project is a renewable energy project and is expected to supply an annual average net electricity of 103,220 MWh to NWPG during the fixed 10-year crediting period, which will replace power generation of those fossil fuel-fired power plants delivered to the NWPG under the baseline scenario. The project is expected to achieve GHG emission reductions of 80,439 tCO2e annually. The total emission reductions during the fixed 10-year crediting period reaches 804,390 tCO2e. The project is expected to contribute to 3 SDGs which are SDG 7, 8 and 13. |
---|