PROJECT DETAILS

Project Submission No. S00747
Project Title Tiantangshan 50MW wind power generation project
Project Owner (as per PSF & LOA) Chenzhou Xiangshui Tiantangshan Wind Power Co., Ltd.
Focal Point of Project Owners*(FP)
Chenzhou Xiangshui Tiantangshan Wind Power Co., Ltd.
Email of Contact Person of FP (Primary) gcc_czxs@163.com
Email of Contact Person of FP (Secondary) maohp@ideacarbon.org
Country China
Submission Date 28 May 2022
Global Stakeholder Consultation Period 21 Dec 2022 - 4 Jan 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, V3.0
Forecasted GHG Emission Reduction(TCO2/Year) 79,413
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 7, 8, 9,
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Shanghai ideacarbon information technology Co., Ltd
Name of Focal Point of External Representative Liu Kaicheng
Email-id of Focal Point liukc@ideacarbon.org
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Tiantangshan 50MW wind power generation project (hereinafter referred to as the proposed project) aims to install a wind farm with total capacity of 49.9MW in Guiyang county, Hunan Province, P.R.China, utilizing wind resources for electricity generation. The electricity generated from the project will be sold to Central China Power Grid (CCPG). The proposed project delivers the renewable energy and achieve greenhouse gas (GHG) emission reductions through displacement of electricity delivered by CCPG which is a fossil-fuel dominated power grid.

The project is operational since 16/03/2017, which is the date when the last wind turbine starts supplying electricity to the grid. The project complies with the relevant regulations and laws in China. In line with Chinese environmental regulations, an “Environmental Impact Assessment (EIA) Approval Letter” was approved by Hunan Provincial Department of Environmental Protection.

The project involves the installation of 25 wind turbines (24 x 2MW, and 1 x 1.9MW), which amount to a total installed capacity of 49.9MW. The project located at Guiyang county, Hunan Province, P.R.China. The proposed project is constructed and operated by Chenzhou Xiangshui Tiantangshan Wind Power Co., Ltd. The estimated annual net electricity generation and average annual emission reductions of the proposed project are 111,010MWh and 79,413 tCO2e, respectively. The total GHG emissions reductions in the chosen fixed 10 years crediting period amount to 794,130 tCO2e.

Additional Information