PROJECT DETAILS

Project Submission No. S00259
Project Title Kaskelen 50 MWp Solar Power Plant
Project Owner (as per PSF & LOA) Climate Bridge (Shanghai) Ltd.
Submission Date 27 May 2022
Global Stakeholder Consultation Period 3 Jul 2022 - 17 Jul 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version GCCM001 v3.0
Forecasted GHG Emission Reduction (tCO2e/Year) 46,954 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Country Kazakhstan
Focal Point of Project Owners (FP)
Climate Bridge (Shanghai) Ltd.
Email of Contact Person of FP (Primary) projects@climatebridge.com
Email of Contact Person of FP (Secondary) huang.shanfeng@climatebridge.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Kaskelen 50 MWp Solar Power Plant Project is a solar PV power project with total installed capacity of 50.83884MWp, locates in about 6 kilometers southwest of the village of Zhanaarna, Almaty State, the Republic of Kazakhstan. The project is invested and operated by Mistral Energy LLP, which is the subsidiaries of Kaskelen Solar LLP. The purpose of the project is to utilize the solar energy at the project site to generate and supply electricity to Kazakhstan Electricity Grid Operating Company (KEGOC).

The project is a renewable energy project and is expected to supply an annual average of 67,289 MWh of zero-emission electricity to KEGOC during the fixed 10-year crediting period, which will replace power generation of those fossil fuel-fired power plants delivered to the KEGOC under the baseline scenario. The project is expected to achieve a green-house gas emission reduction of 46,954 tCO2e annually. The total emission reductions during the fixed 10-year crediting period will be 469,541 tCO2e. 

Additional Information

Host country changed to Kazakhstan compare do initial submission which was erroneous in this context

VERIFICATION OUTCOME
Opinion

Verico SCE has undertaken the project verification of the proposed project «Kaskelen 50 MWp Solar Power Plant » in Republic Kazakhstan to be implemented by Project Owner “Climate Bridge (Shanghai) Ltd.,” based on the requirements defined by GCC program for the project activity, and other rules applicable to the project verification including the host country’s legislation and its specific requirements for sustainable development.

The purpose of the project is to build a solar PV project which results in reductions of GHG emissions of 46,954 tCO2e annually during the fixed 10 year crediting period to replace the electricity generated by fossil fuel dominated power grid in the host country. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring GCCM001 ver.4.0 and is assessed against latest valid Project Standard, Verification Standard and Environment and Social Safeguards Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance.

To arrive at the final verification conclusions and opinion, verico SCE carried out desk reviews, background investigations and an on-site mission, taking into account the sustainable development related regulations/laws in the host country and specific GCC rules/requirements as well as applicable CDM standards, in particular the approved methodology GCCM001 ver.4.0.

Through the project verification process, the verification team identified four (4) corrective action requests and eight (8) clarification requests. The Project Owner has taken actions to address the findings and submitted to verico SCE several sets of project document revisions resulting in a final Project Submission Form, version 2.1 dated 05 December 2023 substantiated by supporting evidence. All findings have been appropriately closed before the issuance of this project verification statement.

The verification team is of the opinion that the GCC project: «Kaskelen 50 MWp Solar Power Plant» with the verified final version of Project Submission Form:

a.  is in accordance with all the relevant GCC program requirements as well as the host country’s national requirements and if implemented as designed, is likely to achieve the verified emission reduction estimations of 46,954 tCO2e annually, following the monitoring provisions fixed in the final documentation;

b.  is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental Nonet-harm Label (E+ ) and the Social No-net-harm Label (S+ ); and

c.  is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs (7, 8 and 13), which is likely to achieve the Silver SDG certification label (SDG+).

The project meets all of the GCC Rules and criteria for CORSIA and the project owner has clarified the intent use of carbon credits for the pilot phase of CORSIA hence for carbon credits issued generated during 01/01/2016 to 31/12/2020, HCA is not required for CORSIA labelled credits.

 

Therefore, verico SCE hereby certifies that the Project Submission Form version 2.1 dated 05 December 2023 of the proposed GCC project «Kaskelen 50 MWp Solar Power Plant » is in accordance with the above stated requirements.

Report (Public) Verification Report (public)
Verification report date 2024-01-18
First Request for Registration Date 2023-06-05