PROJECT DETAILS

Project Submission No. S00252
Project Title Serum group Wind power project in Karnataka
Project Owner (as per PSF & LOA) Serum Institute of India Private Limited
Submission Date 27 May 2022
Global Stakeholder Consultation Period 14 Jun 2022 - 28 Jun 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation - Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 29,955 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Country India
Focal Point of Project Owners (FP)
Serum Institute of India Private Limited
Email of Contact Person of FP (Primary) santosh.tupe@seruminstitute.com
Email of Contact Person of FP (Secondary) santosh.tupe@seruminstitute.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief


The Project activity will generate emission reductions by generate the clean electricity from the wind energy and feed the generated electricity to the national grid of India; which is mainly dominated by thermal/fossil fuel-based power plant. The average annual electricity supplied to grid will be of 32,193 MWh and the translating into emission reductions of around 29,955 tCO2eq per year.
The project also contributes to Environmental No-net-harm Label (E+), Social No-net-harm Label (S+), CORSIA requirements (C+) and 4 United Nations Sustainable Development Goals (SDG+) i.e., SDG 4,7,8and 13.

Additional Information

The annual estimated emission reductions for the project activity is 29,955 tCO2e.

VERIFICATION OUTCOME
Opinion

CCIPL was contracted by Serum Institute of India Private Limited for project verification of the project activity “Serum group Wind power project in Karnataka” in India. The project verification was performed based on rules and requirements defined by GCC for the project activity.

The project activity is a wind power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring AMS-I.D “Grid connected renewable electricity generation” Version 18.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard, Project- Sustainability-Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms.
The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 299,550 tCO2e/year over the 10 years crediting period starting from 29/03/2018.
CCIPL has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains the information with regard to fulfilment of the requirements for project verification, as appropriate. CCIPL applied the following verification process and methodology using a competent verification team;
• The desk review of documents and evidence submitted by the project owner in context of the reference GCC rules and guidelines issued,
• Undertaking/conducting site visit, interview, or interactions with the representative of the project owner
• Reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate
• Preparing a draft verification opinion based on the auditing findings and conclusions
• Technical review of the draft project verification opinion along with other documents as appropriate by an independent competent technical review team.
• Finalization of the project verification opinion (this report)

Carbon Check (India) Private Limited (CCIPL) has verified and hereby certifies that the GCC project activity “Serum group Wind power project in Karnataka” in India.
a. Has correctly described the Project Activity in the Project Submission Form including the applicability of the approved methodology AMS-I.D Version 18.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively.
b. Is likely to generate GHG emission reductions amounting to the estimated 299,550 tCO2e over the entire crediting period as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;
c. is not likely to cause any net-harm to the environment and/or society and complies with the environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental Nonet-harm Label (E+) and the Social Nonet- harm Label (S+); and d. is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 5 SDGs, which is
likely to achieve the Gold SDG certification label (SDG+)
e. is likely to contribute to CORSIA Eligible Emission Units and has CORSIA Label (C+) certification valid till 31 December 2020. A written attestation from the Host country on double counting is not required until 31 December 2020 and the project was found meeting the applicable requirements prescribed by ICAO.

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2022-09-06