PROJECT DETAILS

Project Submission No. S00030
Project Title Göktepe WPP
Project Owner (as per PSF & LOA) SEKANS ENERJI LIMITED SIRKETI
Focal Point of Project Owners*(FP)
Sekans Enerji Limited Sirketi
Email of Contact Person of FP (Primary) sila@sekansdanismanlik.com
Email of Contact Person of FP (Secondary) sila@sekansdanismanlik.com
Country Türkiye
Submission Date 27 Oct 2021
Global Stakeholder Consultation Period 21 Nov 2021 - 5 Dec 2021
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002 ver.20
Forecasted GHG Emission Reduction(TCO2/Year) 168,754
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 7,8,9,13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization SEKANS ENERJI ENERJI LIMITED SIRKETI
Name of Focal Point of External Representative SILA DURAN
Email-id of Focal Point sila@sekansdanismanlik.com
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Göktepe WPP is a new built wind-farm project, located in Yalova Province, Turkey. The generation license of the project was issued in 04/06/2020 for 49 years. The project has an installed capacity of    112.7 MWm/110 MWe and annual generation is estimated to be 260,343 MWh.The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 168,754 tonnes of CO2.

 

 