PROJECT DETAILS

Project Submission No. S00030
Project Title Göktepe WPP
Project Owner(s) (as per PSF & LOA) SEKANS ENERJI LIMITED SIRKETI
Submission Date 2021-10-27
Global Stakeholder Consultation Period 2021-11-21 to
2021-12-05
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002 ver.20
Forecasted GHG Emission Reduction (tCO2e/Year) 168,754
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Sekans Enerji Limited Sirketi
Email of Contact Person of FP (Primary) sila@sekansdanismanlik.com
Email of Contact Person of FP (Secondary) sila@sekansdanismanlik.com
Name of Authorized External Representative Organization SEKANS ENERJI ENERJI LIMITED SIRKETI
Name of Focal Point of External Representative SILA DURAN
Email-id of External representative sila@sekansdanismanlik.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Göktepe WPP is a new built wind-farm project, located in Yalova Province, Turkey. The generation license of the project was issued in 04/06/2020 for 49 years. The project has an installed capacity of    112.7 MWm/110 MWe and annual generation is estimated to be 260,343 MWh.The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 168,754 tonnes of CO2.

 

 