Project Submission No. | S00030 |
---|---|
Project Title | Göktepe WPP |
Project Owner (as per PSF & LOA) | SEKANS ENERJI LIMITED SIRKETI |
Focal Point of Project Owners*(FP)
|
Sekans Enerji Limited Sirketi |
Email of Contact Person of FP (Primary) | sila@sekansdanismanlik.com |
Email of Contact Person of FP (Secondary) | sila@sekansdanismanlik.com |
Country | Türkiye |
Submission Date | 27 Oct 2021 |
Global Stakeholder Consultation Period | 21 Nov 2021 - 5 Dec 2021 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 ver.20 |
Forecasted GHG Emission Reduction(TCO2/Year) | 168,754 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 7,8,9,13 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | SEKANS ENERJI ENERJI LIMITED SIRKETI |
Name of Focal Point of External Representative | SILA DURAN |
Email-id of Focal Point | sila@sekansdanismanlik.com |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Göktepe WPP is a new built wind-farm project, located in Yalova Province, Turkey. The generation license of the project was issued in 04/06/2020 for 49 years. The project has an installed capacity of 112.7 MWm/110 MWe and annual generation is estimated to be 260,343 MWh.The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 168,754 tonnes of CO2.
|
---|---|