PROJECT DETAILS

Project Submission No. S00030
Project Title Göktepe WPP
Project Owner (as per PSF & LOA) SEKANS ENERJI LIMITED SIRKETI
Submission Date 27 Oct 2021
Global Stakeholder Consultation Period 21 Nov 2021 - 5 Dec 2021
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002 ver.20
Forecasted GHG Emission Reduction (tCO2e/Year) 168,754 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Country Türkiye
Focal Point of Project Owners (FP)
Sekans Enerji Limited Sirketi
Email of Contact Person of FP (Primary) sila@sekansdanismanlik.com
Email of Contact Person of FP (Secondary) sila@sekansdanismanlik.com
Name of Authorized External Representative Organization SEKANS ENERJI ENERJI LIMITED SIRKETI
Name of Focal Point of External Representative SILA DURAN
Email-id of External representative sila@sekansdanismanlik.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Göktepe WPP is a new built wind-farm project, located in Yalova Province, Turkey. The generation license of the project was issued in 04/06/2020 for 49 years. The project has an installed capacity of    112.7 MWm/110 MWe and annual generation is estimated to be 260,343 MWh.The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 168,754 tonnes of CO2.

 

 

Additional Information
VERIFICATION OUTCOME
Opinion

KBS Certification Services Pvt. Ltd.,has been contracted by Erguvan Enerji Elektrik Üretim A.Ş. to undertake the independent project verification of the GCC project activity which is Goktepe WPP. The GCC Project Verifier, KBS Certification Services Pvt. Ltd., has verified and certified that Göktepe WPP

 

a)     has correctly described the Project Activity in the PSF /1/ version 04, dated 09/10/2022 including the applicability of the approved methodology ACM0002 version 20.0 /5/ and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

 

b)     is likely to generate GHG emission reductions amounting to the estimated 168,754 tCO2eq annual average, as indicated in the PSF /1/, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

c)     is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+);

d)     is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 4 SDGs, which is likely to achieve the Gold SDG certification label (SDG+); and

e)     is eligible for CORSIA Label (C+) certification.

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2022-11-18