Project Submission No. S00578
Project Title Jiaxian Fangta 50MW Wind Power Project
Project Owner (as per PSF & LOA) Gansu ruicarbon Technology Consulting Co., Ltd
Focal Point of Project Owners*(FP)
Gansu ruicarbon Technology Consulting Co., Ltd
Email of Contact Person of FP (Primary) gansuruicarbon@163.com
Email of Contact Person of FP (Secondary) rui_carbon@163.com
Country China
Submission Date 27 May 2022
Global Stakeholder Consultation Period 6 Nov 2022 - 20 Nov 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 80,896
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG #7, #8
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Jiaxian Fangta 50MW Wind Power Project (hereafter referred to as “the project”) is a wind power project with total installed capacity of 50MW. The project is invested and operated by Jiaxian Dahua New Energy development Co., Ltd. The project is located in Fangta Town, Jiaxian County, Yulin City, Shaanxi Province,China.

The project is connected to Northwest China Power Grid(NWCPG) and is expected to supply  103,806MWh  to NWCPG annually during the fixed 10-year crediting period, which will displace power generation of those fossil fuel-fired power plants delivered to the NWCPG in the baseline scenario. The project is expected to achieve GHG emission reductions of 80,896 tCO2e annually. The total emission reductions during the fixed 10-year crediting period reaches 808,960 tCO2e.

The project is expected to contribute to 4 SDGs which are SDG 7, 8 and 13.