PROJECT DETAILS

Project Submission No. S00278
Project Title KOZBÜKÜ HEPP
Project Owner (as per PSF & LOA) NAS ENERJİ A.Ş.
Submission Date 26 May 2022
Global Stakeholder Consultation Period 31 Jul 2022 - 14 Aug 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002 ver.20
Forecasted GHG Emission Reduction (tCO2e/Year) 144,667 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Country Türkiye
Focal Point of Project Owners (FP)
NAS ENERJİ A.Ş.
Email of Contact Person of FP (Primary) cagdascosar@nasenerji.com.tr
Email of Contact Person of FP (Secondary) ofnasiroglu@fernas.com.tr
Name of Authorized External Representative Organization -
Name of Focal Point of External Representative -
Email-id of External representative ofnasiroglu@fernas.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

 Kozbükü HEPP is a new built hydroelectric power plant project, located in Ordu Province, Turkey owned by Nas Enerji A.Ş. The generation license of the project was granted in 09/03/2017 for 49 years. The project has an installed capacity of 83.57 MWm/81.08 MWe and annual generation is estimated to be 260,568 MWh.

The purpose of the Project is to produce renewable electricity using hydrology as the power source and supply electricity to Turkey’s national grid to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated by fossil fuel fired power plants. The annual emission reduction estimated by the project is 148,680 tonnes of CO2. During the crediting period, 1,486,800 tonnes of CO2 are expected to be reduced. The Project consists of 4 units each having an installed capacity of 20.892 MWm/20.270 MWe. Total installed capacity of the project is 83.57 MWm/81.08 MWe. 

Additional Information
VERIFICATION OUTCOME
Opinion

KBS Certification Services Ltd. has been contracted by Nas Enerji A.Ş. to undertake the independent project verification of the GCC project activity which is KOZBÜKÜ HEPP. The GCC Project Verifier, KBS-

a) has correctly described the Project Activity in the PSF version 05 and dated 26/07/2023 including the applicability of the approved methodology ACM0002 version 20.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

b) is likely to generate GHG emission reductions amounting to the estimated 144,667 Tco2eq annual average, as indicated in the PSF , which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064- 2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

c) is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental Nonet-harm Label (E+) and the Social No-net-harm Label (S+);

d) is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard , and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+); and

e) is eligible for CORSIA Label (C+) certification

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2023-07-30