PROJECT DETAILS

Project Submission No. S00648
Project Title BT1 Windfarm
Project Owner(s) (as per PSF & LOA) BT1 Windfarm Joint Stock Company
Submission Date 2022-05-26
Global Stakeholder Consultation Period 2022-11-28 to
2022-12-12
Registration Date 2026-05-21
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 215,905
Verified GHG Emission Reduction (tCO2e/Year) 215,905
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility
Location Details Open Full Map
Country
 Viet Nam
Focal Point of Project Owners
BT1 Windfarm Joint Stock Company
Email of Contact Person of FP (Primary) duc.hua@ami-acrenewables.vn
Email of Contact Person of FP (Secondary) damien.culloty@AMI-ACRENEWABLES.vn
Project Verifier Bureau Veritas India Private Limited
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

The BT1 Windfarm is the greenfield grid-connected wind power project located in Hai Ninh and Gia Ninh Communes of Quanh Ninh district, Quang Binh Province, Vietnam. The legal owner of the project activity is BT1 Windfarm Joint Stock Company, a member unit of AMI AC Renewables Corporation, a joint venture unit between AMI Renewables and AC Energy Corporation. The project activity has a total installed capacity of 109.2 MW, with a power generation capacity of 274,000 MWh per annum. The project activity involves the installation of 26 Wind Turbine Generators (WTGs), each has an installed capacity of 4.2 MW. It is expected to reduce GHG emissions by 215,905 tCO2e annually.

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2025-11-26
First Request for Registration Date 2023-05-11
Opinion

Bureau Veritas (India) Private Limited (BVIL) has performed a Verification of the “BT1 Windfarm” Project
Activity in host country Vietnam. The Verification was performed on the basis of GCC, UNFCCC and host
country criteria and also on the criteria given to provide for consistent project operations, monitoring and
reporting. The Verification consisted of the following three phases: i) a desk review of the project design
and the baseline and monitoring plan; ii) follow-up interviews with project stakeholders; iii) the resolution of
outstanding issues and the issuance of the final Verification report and opinion.
Project Owner (PO) used the latest tool for demonstration of the additionality. In line with this tool, the PSF
provides analysis of investment, technological and other barriers to determine that the project activity itself
is not the baseline scenario.
By the description of the project as provided in earlier sections of the Verification report, the project is likely
to result in reductions of GHG emissions partially. An analysis of the investment and technological barriers
demonstrates that the proposed project activity is not a likely baseline scenario. GCCVERs attributable to
the project are hence additional to any that would occur in the absence of the project activity. Given that
the project is implemented and maintained as designed, the project is likely to achieve the estimated
amount of GCC VERs, viz; 215,905 tCO2e per annum.
The review of the Project Submission Form (version 3.1) and the subsequent follow-up interviews have
provided Bureau Veritas (India) Private Limited with sufficient evidence to determine the fulfilment of stated
criteria. In our opinion, the project activity correctly applies and meets the relevant GCC & UNFCCC
requirements for the GCC and the relevant host country criteria as confirmed below. BVIL thus requests
registration of “BT1 Windfarm” as a GCC project activity.