Project Submission No. | S00801 |
---|---|
Project Title | Celebi SPP |
Project Owner(s) (as per PSF & LOA) | CK Güneş Enerji Üretim Ticaret Ve Satış A.Ş. |
Submission Date | 2022-05-25 |
Global Stakeholder Consultation Period |
2023-01-05 to 2023-01-19 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Life Iklim ve Enerji Ltd. Sti. |
Email of Contact Person of FP (Primary) | ramazan.aslan@lifeenerji.com |
Email of Contact Person of FP (Secondary) | mustafa.eskicirak@cengiz.com.tr |
Name of Authorized External Representative Organization | Life İklim ve Enerji Ltd. Şti. |
Name of Focal Point of External Representative | Ramazan Aslan |
Email-id of External representative | ramazan.aslan@lifeenerji.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Celebi SPP consists of 16 individual Unlicensed Photovoltaic Solar Power Plants and its total install capacity is 15.984 MWe. The plant was established in the accordance with the law of Electricity Market (Law no: 6446). 16 individual facilities are located in Sivas, Turkey. The project aim to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity is 15.984 MWe. The average annual generated energy is expected to be 30,279 MWh according to the feasibility report of the each plant and the project will be able to deliver a reduction in emissions of around 19,645 tCO2e (tons of carbon dioxide equivalent) per annum. Moreover, estimated total GHG emission reduction over the crediting period is expected to be 178,473 tCO2e (tons of carbon dioxide equivalent). |
---|