Project Submission No. | S00024 |
---|---|
Project Title | 2017 No. 4 Project Shouyang PV Power Forerunner Hub (Shanghu Town, Xiluo Town, Mashou Town) |
Project Owner (as per PSF & LOA) | Timing Carbon Assets Management Co., Ltd/Shouyang New Energy Science & Technology Co., Ltd. |
Submission Date | 12 Oct 2021 |
Global Stakeholder Consultation Period | 2 Nov 2021 - 16 Nov 2021 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects’,Version 2.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 117,106 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Country | China |
---|---|
Focal Point of Project Owners (FP)
|
Timing Carbon Assets Management Co., Ltd |
Email of Contact Person of FP (Primary) | sammi.liu@timing-carbon.com |
Email of Contact Person of FP (Secondary) | chenxiufu@adb-energy.com |
Email-id of External representative | sammi.liu@timing-carbon.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | 2017 No. 4 Project Shouyang PV Power Forerunner Hub (Shanghu Town, Xiluo Town, Mashou Town) (hereinafter referred to as “the proposed project”) is located in Shouyang County, Jinzhong City, Shanxi Province, the People’s Republic of China. The primary objective of the proposed project is to generate renewable electricity to meet the ever-increasing demand in the Shanxi Province and the North China Power Grid (NCPG). The proposed project is a greenfield project with a capacity of 100 MW. Annual power delivered to grid is expected to 141,621MWh. Greenhouse gas emission reduction of estimated 117,106 tCO2e per year can be achieved. |
---|---|
Additional Information |
Opinion | The GCC Project Verifier [EPIC Sustainability Services Private Limited], certifies the following with respect to the GCC Project Activity [2017 No. 4 Project Shouyang PV Power Forerunner Hub (Shanghu Town, Xiluo Town, Mashou Town)]. The Project Owner has correctly described the Project Activity in the Project Submission Form (version 2.0, dated 28/04/2022) including the applicability of the approved methodology [GCCM001, version 2.0] and meets the methodology applicability conditions and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reductions estimates correctly and conservatively. The Project Activity is likely to generate GHG emission reductions amounting to the estimated [117,106] TCO2e annually, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3. The Project Activity is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and is likely to achieve the following labels Environmental No-net-harm Label (E+) and Social No-net-harm Label (S+) The Project Activity is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), complies with the Project Sustainability Standard, and contributes to achieving a total of [4] SDGs, with the Gold SDG certification label (SDG+): The Project Activity complies with all the applicable requirements of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.2 paragraph 21-23, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project The Project Activity complies with all the applicable GCC rules and therefore recommends GCC Program to register the Project activity with above mentioned labels. |
---|---|
Report (Public) | Verification Report (public) |
Verification report date | |
First Request for Registration Date | 2022-07-05 |