Project Submission No. | S00432 |
---|---|
Project Title | Sichuan Qianwei Hydropower Project |
Project Owner(s) (as per PSF & LOA) | Guizhou Search CO2 Environmental Technology Service Co., Ltd |
Submission Date | 2022-05-20 |
Global Stakeholder Consultation Period |
2022-09-27 to 2022-10-11 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 1,116,837 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
China
|
---|---|
Focal Point of Project Owners
|
Guizhou Search CO2 Environmental Technology Service Co., Ltd |
Email of Contact Person of FP (Primary) | business@quantacarbon.com |
Email of Contact Person of FP (Secondary) | 410748224@qq.com |
Name of Authorized External Representative Organization | Guizhou Search CO2 Environmental Technology Service Co., Ltd |
Name of Focal Point of External Representative | Can Wang |
Email-id of External representative | 410748224@qq.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The proposed Sichuan Qianwei Hydropower Project (hereafter referred to as “the project”) is located at the downstream of Sichuan Province, Qianwei County of Leshan City. The Project is invested, built and operated by Sichuan Minjiang Port and Channel Development Co., Ltd. Therefore, Sichuan Minjiang Port and Channel Development Co., Ltd. is the project developer and legal owner of the project facilities. Guizhou Search CO2 Environmental Technology Service Co., Ltd. was authorized by Sichuan Minjiang Port and Channel Development Co., Ltd. to act as the project owner of the proposed GCC project and carbon credits under GCC program. The recommended normal storage level for this project is 335 m, the ‘dead’ water level is 334 m, and the daily regulating reservoir capacity is 15.75 million m3. The installed capacity of the power station is 500.04 MW, with 9 units and a capacity of 55.56 MW for each unit. The maximum diversion rate of power generation is 4,429 m3/s. Minjiang River is also an important channel to contact neighboring provinces and cities and the middle and lower reaches of the Yangtze River and to improve the comprehensive transportation system. |
---|