PROJECT DETAILS

Project Submission No. S00432
Project Title Sichuan Qianwei Hydropower Project
Project Owner(s) (as per PSF & LOA) Guizhou Search CO2 Environmental Technology Service Co., Ltd
Submission Date 2022-05-20
Global Stakeholder Consultation Period 2022-09-27 to
2022-10-11
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 1,116,837
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 China
Focal Point of Project Owners
Guizhou Search CO2 Environmental Technology Service Co., Ltd
Email of Contact Person of FP (Primary) business@quantacarbon.com
Email of Contact Person of FP (Secondary) 410748224@qq.com
Name of Authorized External Representative Organization Guizhou Search CO2 Environmental Technology Service Co., Ltd
Name of Focal Point of External Representative Can Wang
Email-id of External representative 410748224@qq.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed Sichuan Qianwei Hydropower Project (hereafter referred to as “the project”) is located at the downstream of Sichuan Province, Qianwei County of Leshan City. The Project is invested, built and operated by Sichuan Minjiang Port and Channel Development Co., Ltd. Therefore, Sichuan Minjiang Port and Channel Development Co., Ltd. is the project developer and legal owner of the project facilities. Guizhou Search CO2 Environmental Technology Service Co., Ltd. was authorized by Sichuan Minjiang Port and Channel Development Co., Ltd. to act as the project owner of the proposed GCC project and carbon credits under GCC program. The recommended normal storage level for this project is 335 m, the ‘dead’ water level is 334 m, and the daily regulating reservoir capacity is 15.75 million m3. The installed capacity of the power station is 500.04 MW, with 9 units and a capacity of 55.56 MW for each unit. The maximum diversion rate of power generation is 4,429 m3/s. Minjiang River is also an important channel to contact neighboring provinces and cities and the middle and lower reaches of the Yangtze River and to improve the comprehensive transportation system.

© 2024 Global Carbon Council