PROJECT DETAILS

Project Submission No. S00440
Project Title Adanus Landfill Gas to Electricity Project
Project Owner (as per PSF & LOA) ITC-KA Enerji Üretim Sanayi ve Ticaret A.Ş ; EKI Energy Services Limited (act as a project owner)
Focal Point of Project Owners*(FP)
EKI Energy Services Limited
Email of Contact Person of FP (Primary) manish@enkingint.org
Email of Contact Person of FP (Secondary) naveen@enkingint.org
Country Türkiye
Submission Date 18 May 2022
Global Stakeholder Consultation Period 28 Sep 2022 - 12 Oct 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0001: Flaring or use of landfill gas - Version 19.0; ACM0022: Alternative waste treatment processes - Version 3.0
Forecasted GHG Emission Reduction(TCO2/Year) 108,041
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 7,8,9,11
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Adanus Landfill Gas to Electricity Project, developed by the ITC-KA Enerji Üretim Sanayi ve Ticaret A.Ş.” (hereafter referred to as the “project owner”) is located at the Adana landfill site in Adana Province of Turkey. The proposed project includes two activities one being the LFG extraction and its utilization for power generation and the other one being anaerobic decomposition of organic waste in anerobic digestor resulting in biogas generation and its utilization for power generation.

Additional Information

The annual emission calculation for this project activity is 108,041 TCO2e.