PROJECT DETAILS

Project Submission No. S00831
Project Title Rio do Vento Complex Project
Project Owner (as per PSF & LOA) Casa dos Ventos Comercializadora de Energia S/A / CDV Holding S.A.
Focal Point of Project Owners*(FP)
Casa dos Ventos Comercializadora de Energia S/A
Email of Contact Person of FP (Primary) portfolio@casadosventos.com.br
Email of Contact Person of FP (Secondary) erick.lima@casadosventos.com.br
Country Brazil
Submission Date 17 May 2022
Global Stakeholder Consultation Period 19 Jan 2023 - 2 Feb 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002 – Grid-connected electricity generation from renewable sources V20.0
Forecasted GHG Emission Reduction(TCO2/Year) 918498
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 1, 7, 8, 9, 10, 11 and 13
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point portfolio@casadosventos.com.br
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The proposed project activity consists in the implementation and operation of eight new wind electricity generation facilities, Ventos de Santa Martina I, IX, X, XI, XII, XIII, XIV and Ventos de São Januário XXIII, located in the municipalities of Caiçara do Rio do Vento, Ruy Barbosa and Riachuelo, in the Rio Grande do Norte state, Brazil. The project activity will employ 120 horizontalaxis
aerogenerators (model: Vestas V150), each with 4.2 MW (total nominal capacity: 504 MW). All the windfarms mentioned above will use 15 aerogenerators each. The physical implementation of
the project activity started on 18/05/2021.

The project activity will deliver 2,571,125 MWh/year of renewable electricity to the National Interconnected System (Sistema Interligado Nacional - SIN). In the baseline, electricity delivered to
the grid by the project activity would have been generated by the operation of grid-connected power plants and by the addition of new generation sources, as reflected in the combined margin (CM) calculations. Hence, the project activity will promote GHG emissions reductions by displacing fossil fuel-based electricity generation that would otherwise occur.