PROJECT DETAILS

Project Submission No. S00241
Project Title Hong Phong 1 Wind Power Plant
Project Owner (as per PSF & LOA) Hong Phong 1 Wind Power Joint Stock Company
Focal Point of Project Owners*(FP)
Hong Phong 1 Wind Power Joint Stock Company
Email of Contact Person of FP (Primary) louis.aniban@thebluecircle.sg
Email of Contact Person of FP (Secondary) duyen.duong@thebluecircle.sg
Country Viet Nam
Submission Date 17 May 2022
Global Stakeholder Consultation Period 29 May 2022 - 12 Jun 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 106,060 tCO2/year
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 1, 7, 8 & 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The Hong Phong 1 Wind Power Plant is the greenfield grid-connected wind power project located in Hong Phong Commune, Bach Binh District, Binh Thuan Province, Vietnam. The proposed project activity is legally owned by Hong Phong 1 Wind Power Joint Stock Company. The project activity has a total installed capacity of 42.4 MW, with a power generation capacity of 131,900 MWh per annum. The project activity involves the installation of 8 Wind Turbine Generators (WTGs), each has an installed capacity of 5.3 MW. It is expected to reduce GHG emissions by 106,060 tCO2e annually.

Additional Information