Project Submission No. | S00431 |
---|---|
Project Title | Uludağ Landfill Gas to Electricity Project |
Project Owner(s) (as per PSF & LOA) | ITC-KA Enerji Üretim Sanayi ve Ticaret A.Ş. ; EKI Energy Services Limited (act as a project owner) |
Submission Date | 2022-05-17 |
Global Stakeholder Consultation Period |
2022-09-27 to 2022-10-11 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | LFG Power Generation |
GCC/CDM Methodology & Version | ACM0001: Flaring or use of landfill gas - Version 19.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
EKI Energy Services Limited |
Email of Contact Person of FP (Primary) | manish@enkingint.org |
Email of Contact Person of FP (Secondary) | naveen@enkingint.org |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Uludağ Landfill Gas to Electricity Project, developed by the ITC-KA Enerji Üretim Sanayi ve Ticaret A.Ş.” (hereinafter referred to as the “project owner”) and it is located at Uludağ Solid Waste Landfill Area in Osmangazi District of Bursa Province in Turkey. The project includes the LFG extraction and its utilization for power generation. The project activity is operational with a total of 8 gas engines with a total installed capacity of 11.32 MWe. The activity generates approximately 84,900 MWh/annum of energy and delivered to the national grid which is mainly dominated by thermal/fossil fuel-based power plant. The Project activity is expected to result in 88,066 tCO2e average emission reductions annually and cumulative emission reduction of 880,666 tCO2e over the crediting period. |
---|