Project Submission No. S00224
Project Title Makascı-9 Solar Power Plant Bundle
Project Owner(s) (as per PSF & LOA) 1. Makascı İnşaat Enerji ve Ticaret Anonim Şirketi 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Submission Date 2022-05-16
Global Stakeholder Consultation Period 2022-05-17 to
2022-05-31
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 14,147
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Makascı-9 Solar Power Plant Bundle constructed by  Makascı İnşaat Enerji ve Ticaret A.Ş. Makascı-9 Solar Power Plant Bundle consists of 15 individual Unlicensed Solar Power Plants with a capacity of 14.861 MWp / 13.883 MWe in total. The total installed capacity is 13.883 MWe. After 2019 all plants are activated, the average annual generated energy become 21,825 MWh and the project will be able to deliver a reduction in emissions of around 14,147 tCO2e (tons of carbon dioxide equivalent) per annum averagely. For the entire crediting period, 141,468 tons of CO2e are expected to be reduced.