PROJECT DETAILS

Project Submission No. S00251
Project Title Wind Power Project in Jhimpir Thatta, Sindh by Indus Wind Energy Limited
Project Owner (as per PSF & LOA) Indus Wind Energy Limited
Focal Point of Project Owners*(FP)
Emergent Ventures India Pvt. Ltd.
Email of Contact Person of FP (Primary) atul.sanghal@emergent-ventures.com
Email of Contact Person of FP (Secondary) indus.wind@indus-group.com
Country Pakistan
Submission Date 16 May 2022
Global Stakeholder Consultation Period 9 Jun 2022 - 23 Jun 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0
Forecasted GHG Emission Reduction(TCO2/Year) 96,185 tCO2e
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals Goals 3, 4, 6, 7, 8,13
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Emergent Ventures India Pvt. Ltd.
Name of Focal Point of External Representative Atul Sanghal
Email-id of Focal Point atul.sanghal@emergent-ventures.com
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The purpose of project activity is to generate and feed to the connected national electricity grid of Pakistan, GHG free electricity by the installation of 50 MW wind power plant. The wind project is located in Jhimpir, District Thatha, Sindh Pakistan.

The project boundary includes the project sites where the wind turbines have been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs. 

The baseline of the project activity is continued generation of electricity in the connected national grid in Pakistan. The electricity generation in Pakistan is highly carbon intensive. According to the latest data from Pakistan Energy Yearbook, published by ministry of energy on carbon intensity of grid electricity, the combined margin emission factor of the grid electricity is 0.578 tCO2e/MWh and therefore electricity generation from wind energy project as in the project activity results into emission reductions. It is estimated that the project activity will effect a cumulative GHG emission reduction of 961,856 tCO2e over 10 year period of project activity with an average of 96,185 tCO2e GHG emission reduction per year and an average of 166,440 MWh electricity generation per year

 

Additional Information