PROJECT DETAILS

Project Submission No. S00251
Project Title Wind Power Project in Jhimpir Thatta, Sindh by Indus Wind Energy Limited
Project Owner(s) (as per PSF & LOA) Indus Wind Energy Limited
Submission Date 2022-05-16
Global Stakeholder Consultation Period 2022-06-09 to
2022-06-23
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 95,686
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Pakistan
Focal Point of Project Owners
Emergent Ventures India Pvt. Ltd.
Email of Contact Person of FP (Primary) atul.sanghal@emergent-ventures.com
Email of Contact Person of FP (Secondary) jatin@emergent-ventures.com
Name of Authorized External Representative Organization Emergent Ventures India Pvt. Ltd.
Name of Focal Point of External Representative Atul Sanghal
Email-id of External representative atul.sanghal@emergent-ventures.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity involves the installation of 50 MW (25 wind turbine of 2 MW each) Wind Power Plant located in Jungshahi, District Thatta, Sindh Pakistan. The aim of the project is to generate electricity from renewable source of energy (wind) and feed to the connected national electricity grid of Pakistan which leads to reduction in GHG emissions. The project activity involves the development, construction and operation of a Greenfield Wind power plant by Indus Wind Energy Limited. The estimated annual average power generation, by the project activity, for the next 10 years is 166,440 MWh, which is exported to the national grid of Pakistan. It will result into annual average ACCs of up to 95,686 tCO2e and a total of 956,863 tCO2e ACCs over 10-year period. The generated ACCs will be utilized to offset GHG emissions.

 