PROJECT DETAILS

Project Submission No. S00037
Project Title 300 MW Thar Solar Project in Rajasthan
Project Owner (as per PSF & LOA) Thar Surya 1 Private Limited, Enel Green Power
Submission Date 29 Sep 2021
Global Stakeholder Consultation Period 7 Dec 2021 - 21 Dec 2021
Registration Date 6 Feb 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version GCCM001 Version 3.0
Forecasted GHG Emission Reduction (tCO2e/Year) 628,930 (tCO2e/Year)
Verified GHG Emission Reduction (tCO2e/Year) 628,930 (tCO2e/Year)
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Verified Market Eligibility CORSIA(C+)
Country India
Focal Point of Project Owners (FP)
Enel Green Power India Private Limited
Email of Contact Person of FP (Primary) ashwin.madhamshettiwar@enel.com
Email of Contact Person of FP (Secondary) jimmy@infisolutions.org
Name of Authorized External Representative Organization NA
Name of Focal Point of External Representative NA
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Verifier Earthood Services Private Limited
Project Brief

The proposed project activity is the installation of a new grid-connected 300 MW Solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project activity is solar power project which is being implemented in Bikaner, Rajasthan of India by Thar Surya 1 Private Limited. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system.
The electricity generated by the project “300 MW Thar Solar Project in Rajasthan” will thus replace the equivalent amount of electricity generated by the operation of existing grid connected power plants (mostly fossil fuel-based power plants). In this scope, the project owner planned to install Solar Panels in with the purpose of contributing to the national economy. The estimated annual average electricity generation by the project activity is 675,906 MWh.
The crediting period chosen for the project activity “300 MW Thar Solar Project in Rajasthan” is 10 years Crediting Period in which total GHG emission reduction estimated is 6,289,305 tCO2e. The annual average estimated emission reductions from project activity is 628,930 tCO2e/annum.

Additional Information
VERIFICATION OUTCOME
Opinion

ESPL was contracted by Enel Green Power for verification of the project activity “300 MW Thar Solar project in Rajasthan” in India. The verification was performed in accordance with the GCC Project standard/6/, GCC program manual and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting.

The review of the project submission form and the subsequent follow-up interviews have provided us with sufficient evidence to determine the fulfilment of the stated criteria. In our opinion, the project meets all relevant GCC criteria and all relevant host country criteria. The project correctly applies methodology GCCM001 v3.0.

The Project activity is not likely to cause any net-harm to the environment and/or society and complies with the environmental and Social Standard, and therefore requests the GCC Steering Committee to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+).

The Project activity is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+).

The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.1 paragraph 21-23, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project.

By generating renewable energy from solar energy resources, the project results in reduction of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity.

The total emission reductions from the project are estimated to be 6,289,305 tCO2e over a fixed 10 year crediting period, averaging 628,930 tCO2e annually. The emission reduction forecast has been checked and it is deemed likely that the stated amount is achieved given the underlying assumptions do not change. The monitoring plan provides for the monitoring of the project’s emission reductions. The monitoring arrangements described in the monitoring plan are feasible within the project design and it is confirmed that the project owners can implement the monitoring plan.

In conclusion, ESPL is of the opinion that the project activity “300 MW Thar Solar project in Rajasthan” in India, as described in the PSF Version 13, dated 28/12/2022, meets all relevant GCC requirements and all relevant host party criteria and correctly applies the baseline and monitoring methodology “GCCM001”, “Methodology for Renewable energy generation projects supplying electricity to grid or captive consumers”, version 3.0.

The project will hence be recommended by ESPL for registration with the GCC.

Report (Public) Verification Report (public)
Verification report date 2023-01-05
First Request for Registration Date 2022-03-11