Project Submission No. | S00250 |
---|---|
Project Title | 8 WM WIND POWER PROJECT BY AMARJOTHI SPINNING MILLS LIMITED |
Project Owner (as per PSF & LOA) | AMARJOTHI SPINNING MILLS LIMITED |
Focal Point of Project Owners*(FP)
|
AMARJOTHI SPINNING MILLS LIMITED |
Email of Contact Person of FP (Primary) | mill@amarjothi.net |
Email of Contact Person of FP (Secondary) | mill@amarjothi.net |
Country | India |
Submission Date | 9 May 2022 |
Global Stakeholder Consultation Period | 9 Jun 2022 - 23 Jun 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | AMS- I.D:Grid connected renewable electricity generation”- Version 18.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 16302 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 3, SDG 7, SDG 8, SDG 13 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The project activity consists of setting up of Wind Turbine Generator (WTGs) of a total capacity of 8 MW (2.00 MW x 4 nos.) in the state of Tamil Nadu, India by M/s Amarjothi Spinning Mills Limited. All the WTGs are manufactured by M/s. Siemens Gamesa Renewable Power Private Limited. The project activity generates power by using the kinetic energy of wind, thus resulting in zero emissions during electricity production. The purpose of the project activity is to supply emission free energy generated by the WTGs to the Tamilnadu Generation and Distribution Corporation Ltd. (TANGEDCO). The power produced would displace an equivalent amount of power from the grid connected power stations, which are mainly fossil fuel fired power plants. Hence, it results in reduction of GHG emissions in electricity generation. |
---|---|
Additional Information | The project will replace anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 16,302tCO2e per year, thereon displacing estimated average of 17,520MWh/year amount of electricity from the generation-mix of power plants connected to the Indian grid, which is mainly dominated by thermal/fossil fuel-based power plant. Project activity will mitigate the total GHG emission reductions of 1,63,024tCO2e over the total crediting period |