Project Submission No. | S00471 |
---|---|
Project Title | Eskişehir Landfill Gas to Electricity Project |
Project Owner(s) (as per PSF & LOA) | EKI Energy Services Limited (Act as a project owner) ; ITC Eskişehir Enerji Üretim Sanayi ve Ticaret A.Ş. |
Submission Date | 2022-05-05 |
Global Stakeholder Consultation Period |
2022-10-05 to 2022-10-19 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | LFG Power Generation |
GCC/CDM Methodology & Version | ACM0001: Flaring or use of landfill gas - Version 19.0 ; ACM0022: Alternative waste treatment processes - Version 3.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
EKI Energy Services Limited |
Email of Contact Person of FP (Primary) | manish@enkingint.org |
Email of Contact Person of FP (Secondary) | naveen@enkingint.org |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Eskişehir Landfill Gas to Electricity Project, developed by the ITC Eskişehir Enerji Üretim Sanayi ve Ticaret Anonim Şirketi (hereafter referred to as the “project owner”) is located at the Eskişehir landfill site in Eskişehir Province of Türkiye. The project includes two activities one being the LFG capture/extraction from landfill site and its utilization for power generation and the other one being anaerobic decomposition of organic waste in anerobic digestor resulting in biogas generation and its utilization for power generation.
|
---|---|
Additional Information | The project activity is operational with a total of 8 gas engines with a total installed capacity of 11.32 MW. The activity generates approximately 79,240 MWh/year of energy and delivered to the national grid which is mainly dominated by thermal/fossil fuel-based power plant. The project activity is expected to result in 125,526 tCO2e average emission reductions annually and cumulative emission reduction of 1,255,266 tCO2e over the crediting period.
|