Project Submission No. | S00268 |
---|---|
Project Title | Atares-2 Wind Power Plant |
Project Owner(s) (as per PSF & LOA) | Ataseven Enerji Üretim A.Ş. |
Submission Date | 2022-04-29 |
Global Stakeholder Consultation Period |
2022-07-25 to 2022-08-08 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Name of Authorized External Representative Organization | Desilyon Danışmanlık Ticaret A.Ş. |
Name of Focal Point of External Representative | Desilyon Danışmanlık Ticaret A.Ş. |
Email-id of External representative | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Ataseven Enerji Üretim A.Ş. has constructed the Atares-2 Wind Power Plant Project. The project includes 23 turbines. Of this, 5 units have 4,8 MWm / 4.8 MWe, the other 8 units have 4.5 MWm / 4.5 MWe, and the remaining 10 units have 4.0 MWm / 4.0 MWe with a total of 100 MWm / 100 Mwe installed capacity. The project will be able to deliver a reduction in emissions of around 181,690 tCO2e annually. For the entire crediting period, 1,816,900 tonnes of CO2 are expected to be reduced. |
---|