Project Submission No. S00268
Project Title Atares-2 Wind Power Plant
Project Owner(s) (as per PSF & LOA) Ataseven Enerji Üretim A.Ş.
Submission Date 2022-04-29
Global Stakeholder Consultation Period 2022-07-25 to
2022-08-08
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 181,690
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Name of Authorized External Representative Organization Desilyon Danışmanlık Ticaret A.Ş.
Name of Focal Point of External Representative Desilyon Danışmanlık Ticaret A.Ş.
Email-id of External representative ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Ataseven Enerji Üretim A.Ş. has constructed the Atares-2 Wind Power Plant Project. The project includes 23 turbines. Of this, 5 units have 4,8 MWm / 4.8 MWe, the other 8 units have 4.5 MWm / 4.5 MWe, and the remaining 10 units have 4.0 MWm / 4.0 MWe with a total of 100 MWm / 100 Mwe installed capacity. The project will be able to deliver a reduction in emissions of around 181,690 tCO2e annually. For the entire crediting period, 1,816,900 tonnes of CO2 are expected to be reduced.