PROJECT DETAILS

Project Submission No. S00452
Project Title Alares-2 Wind Power Plant
Project Owner(s) (as per PSF & LOA) Alares Elektrik Üretim A.Ş.
Submission Date 2022-04-29
Global Stakeholder Consultation Period 2022-10-02 to
2022-10-16
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002 – Grid-connected electricity generation from renewable sources – Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 41,272
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Name of Authorized External Representative Organization Desilyon Danışmanlık Ticaret A.Ş.
Name of Focal Point of External Representative Özlem Özkapı
Email-id of External representative ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Alares Elektrik Üretim A.Ş. has constructed the Alares-2 Wind Power Plant Project in Şahmelek and Örencik Village, Karacabey district, Bursa province, Turkey. The Alares-2 Wind Power Plant is considering 4 turbines and They have 19.2 MWm (DC) / 17.5 Mwe (AC) installed capacity. The earliest commissioning date of the project is 30/06/2021, it has only 4.8 MWm/ 1.5 MWe commissioned power capacity which belongs to T1 turbine. The other units and remainder capacity of the T1 turbine have been commissioned at 01/07/2022. At the end of the date 01/07/2022, plant had (3 x 4.8 MWm/ 3 x 4.38 MWe) and (1 x 4.8 MWm/ 1 x 4.36 MWe) total capacity with 4 wind turbines-generator group in total 19.2 MWm/ 17.5 MWe installed capacity. The project will be able to deliver an average reduction in emissions of around 41,272 tCO2e (tons of carbon dioxide equivalent) annually. Annual electricity production is 70,000,000 kWh according to the generation license.

The average annual generated energy is expected to be 63,612.6 MWh and the project will be able to deliver a reduction in emissions of around 41,272 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 412,719 tons of CO2 are expected to be reduced.