PROJECT DETAILS

Project Submission No. S00413
Project Title Gazi-Sakarbayır Wind Power Plant Bundle
Project Owner(s) (as per PSF & LOA) Arı En Elektrik Üretim Anonim Şirketi
Submission Date 2022-04-29
Global Stakeholder Consultation Period 2022-09-25 to
2022-10-09
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 21.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 47,444
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Name of Authorized External Representative Organization Desilyon Danışmanlık Ticaret A.Ş.
Name of Focal Point of External Representative Özlem Özkapı
Email-id of External representative ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Arı En Elektrik Üretim Anonim Şirketi has constructed the Gazi-Sakarbayır Wind Power Plant Bundle project. The aim of the project is to produce electrical energy from wind to supply the Turkish national grid. The project includes two bundles which are Gazi WPP and Sakarbayır WPP.

The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity is 33.7 MWe / 36.75 MWm. Because of avoiding using fossil fuels, according to the ER Sheet and the emission reduction is estimated around 4,227 tCO2e in 2018, 29,493 tCO2e in 2019 to 2024, 76,455 tCO2e 2025 to 2027 and 63,887 tCO2e in 2028. The differences between the years are because of the different commissioning dates of the units as explained above paragraph. For the entire crediting period, 474,438 tons of CO2 are expected to be reduced.

© 2025 Global Carbon Council