Project Submission No. | S00237 |
---|---|
Project Title | Kirazlıköprü Dam and Hydroelectric Power Plant |
Project Owner (as per PSF & LOA) | MHM Turkey Makine Ticaret Limited Şirketi |
Focal Point of Project Owners*(FP)
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Country | Türkiye |
Submission Date | 28 Apr 2022 |
Global Stakeholder Consultation Period | 25 May 2022 - 8 Jun 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 25,278 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 7, SDG 8, SDG 9, SDG 13 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | MHM Turkey Makine Ticaret Limited Şirketi has constructed the Kirazlıköprü Dam and Hydroelectric Power Plant project. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 2 units. Two of them have 4.00 MWm / 3.96 MWe installed capacity. The total installed capacity is 8.00 MWm / 7.92 MWe. Annual electricity production is expected to be 44,300,000 kWh according to the generation license. The generation license is signed on 15/10/2020. The emission reduction is estimated around 25,278 tCO2e annually. For the entire crediting period, 252,780 tons of CO2 are expected to be reduced. |
---|---|
Additional Information |