| Project Submission No. | S00237 |
|---|---|
| Project Title | Kirazlıköprü Dam and Hydroelectric Power Plant |
| Project Owner(s) (as per PSF & LOA) | Okyanus Enerji Üretim İnşaat A.Ş. |
| Submission Date | 2022-04-28 |
| Global Stakeholder Consultation Period |
2022-05-25 to 2022-06-08 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Hydro Power |
| GCC/CDM Methodology & Version | AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Forecasted SDG+ Label | Gold |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Country |
Türkiye
|
|---|---|
|
Focal Point of Project Owners
|
Desilyon Danışmanlık Ticaret A.Ş. |
| Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
| Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Project Brief | MHM Turkey Makine Ticaret Limited Şirketi has constructed the Kirazlıköprü Dam and Hydroelectric Power Plant project. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 2 units. Two of them have 4.00 MWm / 3.96 MWe installed capacity. The total installed capacity is 8.00 MWm / 7.92 MWe. Annual electricity production is expected to be 44,300,000 kWh according to the generation license. The generation license is signed on 15/10/2020. The average annual generated electricity is expected to be 44,300 MWh according to the generation license and the emission reduction is estimated to be around 24,595 tCO2e annually. For the entire crediting period, 245,950 tons of CO2 are expected to be reduced. |
|---|