Project Title Kirazlıköprü Dam and Hydroelectric Power Plant
Project Owner (as per PSF & LOA) MHM Turkey Makine Ticaret Limited Şirketi
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Türkiye
Submission Date 28 Apr 2022
Global Stakeholder Consultation Period 25 May 2022 - 8 Jun 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 25,278
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

MHM Turkey Makine Ticaret Limited Şirketi has constructed the Kirazlıköprü Dam and Hydroelectric Power Plant project. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 2 units. Two of them have 4.00 MWm / 3.96 MWe installed capacity. The total installed capacity is 8.00 MWm / 7.92 MWe. Annual electricity production is expected to be 44,300,000 kWh according to the generation license. The generation license is signed on 15/10/2020. The emission reduction is estimated around 25,278 tCO2e annually. For the entire crediting period, 252,780 tons of CO2 are expected to be reduced.