PROJECT DETAILS

Project Submission No. S00315
Project Title Susuz Regulator and Hydroelectric Power Plant (Susuz HEPP)
Project Owner (as per PSF & LOA) Köprüyaka Hidrolik Enerji ve Yatırım A.Ş.
Focal Point of Project Owners*(FP)
Köprüyaka Hidrolik Enerji ve Yatırım A.Ş.
Email of Contact Person of FP (Primary) ozgebaki@ziganaenerji.com
Email of Contact Person of FP (Secondary) enerji@krkholding.com
Country Türkiye
Submission Date 27 Apr 2022
Global Stakeholder Consultation Period 18 Aug 2022 - 1 Sep 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.00
Forecasted GHG Emission Reduction(TCO2/Year) 9,945
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Gaia Climate Finansal Danışmanlık Hizmetleri ve Ticaret A.Ş.
Name of Focal Point of External Representative Gediz Kaya
Email-id of Focal Point gkaya@gaiaclimate.com
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Susuz Regulator and Hydroelectric Power Plant (HEPP) with a capacity of 7.32 MW in total, which
is formed according to the Law no: 6446 on Electricity Market Law. The purpose of the project is to
generate clean energy by using the hydropower and providing the energy to the Turkish national grid.
By implementing the project, investors also aim to reduce dependency to the fossil fuels thereby
reducing the sources of environmental pollution.


The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2
emission from electricity generation by fossil fuel power plants connected to Turkish National Power
Grid. Total installed capacity included by the GCC project is drawn as 7.1 MWe. The average annual
generated energy is expected to be 21,460 MWh according to the generation values. The project
is expected to deliver a reduction in emissions of around 10,421 tCO2e (tons of carbon dioxide
equivalent) per annum. The total emission reduction for the whole crediting period is calculated as
99,454 tonnes of CO2.
 

Additional Information