PROJECT DETAILS

Project Submission No. S00205
Project Title Inner Mongolia Jianli Zhaosheng Wulatezhongqi 40MW Solar Power Project
Project Owner (as per PSF & LOA) Prestige Investment Management (Shanghai) Co. Ltd.
Submission Date 27 Apr 2022
Global Stakeholder Consultation Period 28 Apr 2022 - 12 May 2022
Registration Date 3 Nov 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002 version21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 51,763 (tCO2e/Year)
Verified GHG Emission Reduction (tCO2e/Year) 51,763 (tCO2e/Year)
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Verified Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country China
Focal Point of Project Owners (FP)
Prestige Investment Management (Shanghai) Co. Ltd
Email of Contact Person of FP (Primary) gwtz688@126.com
Email of Contact Person of FP (Secondary) 1206611544@qq.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Verifier Shenzhen CTI International Certification Co., Ltd (CTI)
Project Brief

Inner Mongolia Jianli Zhaosheng Wulatezhongqi 40MW Solar Power Project is a solar power project with total installed capacity of 40MW, the project is invested and operated by Inner Mongolia Jianli Zhaosheng Energy Co., Ltd. The project locates in Hailiutu Town, Wulatezhongqi, Bayannaoer City, Inner Mongolia Autonomous Region of China.
The purpose of the project is to utilize the solar energy at the project site to generate and supply electricity to North China Power Grid (NCPG). The project is expected to supply an annual average of 62,599 MWh of zero-emission electricity to NCPG during the fixed 10-year crediting period, which will replace power generation of those fossil fuel-fired power plants delivered to the NCPG under the baseline scenario. The project is expected to achieve a green-house gas emission reduction of 51,763 tCO2e annually. The total emission reductions during the fixed 10-year crediting period will be 517,630 tCO2e.

Additional Information
VERIFICATION OUTCOME
Opinion

CTI was contracted by Prestige Investment Management (Shanghai) Co., Ltd. for verification of the project activity.The verification was performed based on rules and requirements defined by GCC program for the project activity;

This project belongs to the new solar energy grid-connected power generation project, and realizes the emission reduction of greenhouse gases by replacing the same amount of electricity generated by the North China Power Grid dominated by fossil energy. After review, the verification team confirmed that the project has neither registered nor in process of registration with any other GHG/non-GHG Program  except for the application to become GCC. The start date of the project is 10/03/2016, which belongs to the project category A2;

This project has correctly adopted the methodology ACM0002,"Grid-connected electricity generation from 

renewable sources", V21.0;

The objectives of this project verification is to verify that the GCC project meets the requirements of GCC project framework v2.1, GCC program manual v3.1, GCC program processes v4.0, GCC project standard v3.1, GCC project sustainability standard v2.1, GCC verification standard v3.1, GCC Environment & Social safeguards standard v2.0, ISO 14064-2 & ISO 14064-3, applicable approved GCC Methodology for -Grid Connected Renewable Energy Generation Projects ACM0002,"Grid-connected electricity generation from renewable sources", V21.0;, Applicable Legal requirements/rules of host country, National Sustainable Development Criteria and CORSIA requirements and other GCC requirements related to aspects such as project design, applicable conditions, project boundary, baseline scenarios, additionality, emission reduction, monitoring plan, local stakeholder consultation, global stakeholder consultation, GHG emission reductions (ACCs), environmental no-net harm label (E+), social no net harm label (S+), gold SDG label (SDG+),CORSIA+. This report summarizes the final project verification opinion which is based on Project Submission Form v3.0;

The project is operational since 10/03/2016.The estimated annual net electricity generation and average annual emission reductions of the proposed project are 62,599MWh and 51,763 tCO2e, respectively. The total GHG emissions reductions in the chosen fixed 10 years crediting period amount to 517,630 tCO2e;

The project is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No net-harm Label (E+ ) and the Social No-net-harm Label (S+ );

The project is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+).

The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project. The written attestation from the Host country on double counting shall be submitted by the project owner at ACCs issuance stage (A FAR remains open regarding the same)

 

Report (Public) Verification Report (public)
Verification report date 2023-10-11
First Request for Registration Date 2023-04-23
© 2024 Global Carbon Council