PROJECT DETAILS

Project Submission No. S00204
Project Title Watabak Wind Power Project
Project Owner(s) (as per PSF & LOA) Watabak Wind Company Limited
Submission Date 2022-04-25
Global Stakeholder Consultation Period 2022-04-27 to
2022-05-11
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 95,435
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Thailand
Focal Point of Project Owners
Kosher Climate India Private Limited
Email of Contact Person of FP (Primary) narendra@kosherclimate.com
Email of Contact Person of FP (Secondary) napat@windenergyholding.com
Name of Authorized External Representative Organization Kosher Climate India Private Limited
Name of Focal Point of External Representative Vamsi Krishna M
Email-id of External representative vamsi@kosherclimate.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The purpose of this project activity is to generate the clean electricity from the installation of wind turbine generators and feed the generated electricity to the Thailand national grid. The Project activity has installed the Wind Turbine generators to convert the available wind radiation into DC power and there by installed the Inverters to convert the DC power to AC Power.
The proposed project activity involves installation of 60 MW wind power project in Tambon Watabak and Tamban Huay Yai Chew, Thep Sathith district, Chaiyaphum Province in Thailand. The project is fully commissioned and operational and the total project capacity has been connected to the national Grid of Thailand through the erected distribution and transmission lines. Generated power from the project is being supplied to the government distribution companies Electricity Generating Authority of Thailand (EGAT). Project owners have signed a long-term power purchase agreements with the EGAT to supply the generated power at the contracted price.