Project Submission No. | S00201 |
---|---|
Project Title | Renewable wind power project in India -1- 015 |
Project Owner(s) (as per PSF & LOA) | M/s ReNew Green Energy Solutions Private Limited |
Submission Date | 2022-04-22 |
Global Stakeholder Consultation Period |
2022-04-24 to 2022-05-08 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
India
|
---|---|
Focal Point of Project Owners
|
M/s/ ReNew Green Energy Solutions Private Limited |
Email of Contact Person of FP (Primary) | nikunj.nangalia@renewpower.in |
Email of Contact Person of FP (Secondary) | prabhat@renewpower.in |
Name of Authorized External Representative Organization | EKI Energy Services Limited |
Name of Focal Point of External Representative | Manish Dabkara |
Email-id of External representative | manish@enkingint.org |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The Project Activity is the installation of a new grid-connected 100 MW wind power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project is implemented in Karnataka state of India. The project activity is connected to the grid through a 220kV SC line from project pooling substation to 220/110 KPTCL Kushtagi Substation as per Regular Power Evacuation Approval document. The electricity generated from Project Activity is exported to the Indian grid in India there by displacing electricity from the regional grid electricity distribution system generated by fossil fuel-based power plants. The project boundary includes the wind project, sub-stations, grid and all power plants connected to grid. The proposed project activity will evacuate power to the Indian grid. Therefore, the entire Indian grid and all connected power plants have been considered in the project boundary for the project activity. The electricity generated by the Project Activity thus replaces the equivalent amount of electricity generated by the operation of existing/ grid connected power plants (mostly fossil fuel-based power plants) and by addition of new generation sources into the grid. The Project Activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel) and by addition of new generation sources into the grid. |
---|---|
Additional Information | M/s Ostro Dakshin Power Private Limited is the SPV of ReNew Power Private Limited and the project is promoted by ReNew Power Private Limited. The project shall result in replacing anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 298,333 tCO2/year, thereon displacing 320,616 MWh/ year amount of electricity from the generation-mix of power plants connected to the Indian grid, which is mainly dominated by thermal/fossil fuel-based power plant. |