| Project Submission No. | S01305 |
|---|---|
| Project Title | Solar Power Plant Project by Enren-II Energy in Gujarat |
| Project Owner(s) (as per PSF & LOA) | Enren Energy Private Limited |
| Submission Date | 2024-09-05 |
| Global Stakeholder Consultation Period |
2024-12-22 to 2025-01-05 |
| Registration Date | 2025-12-23 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002, Version 22 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Enren Energy Private Limited |
| Email of Contact Person of FP (Primary) | naresh.baluja@engie.com |
| Email of Contact Person of FP (Secondary) | parag.zambad@engie.com |
| Project Verifier | Enviance Services Private Limited |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The proposed project activity is the installation of a new grid connected 200 MW solar plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The proposed plant will be based on Crystalline Silicon technology Solar Panels and centralized inverter. The technology is selected on the basis of energy production and financial cash flow for 25 years. The project activity is a solar power project which is being implemented at Khavda Solar Park, Gujarat by Enren-II Energy Private Limited. The electricity generated from Project Activity will be exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2025-12-11 |
| First Request for Registration Date | 2025-06-25 |
| Opinion | Enviance Services Private Limited has performed a verification of the “Solar Power Plant Project by Enren-II Energy in Gujarat”. The project verification is performed on the basis of GCC criteria Project Verification Standard, Version 3.1/3/ for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. The project is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) (net score +8) and the Social No-net-harm Label (S+) (net score +9); and The project is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard., and contribute to achieving a total of 3 SDGs (7, 8, and 13), which is likely to achieve the gold SDG certification label (SDG+)
|