Project Title Makascı-2 Solar Power Plant Bundle
Project Owner(s) (as per PSF & LOA) 1. Makascı İnşaat Enerji ve Ticaret A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Submission Date 2022-04-19
Global Stakeholder Consultation Period 2022-04-24 to
2022-05-08
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 14,845
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Makascı-2 Solar Power Plant Bundle consists of 17 individual Unlicensed Solar Power Plants with a capacity of 14.661 MWp / 13.721 MWe in total, which is formed according to the Law no: 6446 on Electricity Market Law. Solar panels, inverters and power transmission lines were intended to be built in different regions of Konya province in Türkiye. The purpose of the project is to generate clean energy by using the solar power and providing the energy to the Turkish national grid.

The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity is 13.721 MWe. The average annual generated energy is expected to be 10,125 MWh in 2017 and 23,458 MWh after 2017 with all plants activated. In addition, the project will be able to deliver a reduction in emissions of around 6,563 tCO2e (tons of carbon dioxide equivalent) in 2017 and 15,205 tCO2e after 2017 per annual. Therefore, for the entire crediting period, 14,845 tCO2e averagely and 148,450 tonnes of CO2 totally are expected to be reduced.