PROJECT DETAILS

Project Submission No. S00308
Project Title Bingöl Landfill Gas to Electricity Project
Project Owner(s) (as per PSF & LOA) EKI Energy Services Limited (Act as project owner), ITC-KA Enerji Üretim Sanayi ve Ticaret A.Ş
Submission Date 2022-04-18
Global Stakeholder Consultation Period 2022-08-14 to
2022-08-28
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type LFG Power Generation
GCC/CDM Methodology & Version AMS-III.G: “Landfill methane recovery” --- Version 10.0, AMS-I.D: “Grid connected renewable electricity generation” ---Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 17,624
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
EKI Energy Services Limited
Email of Contact Person of FP (Primary) manish@enkingint.org
Email of Contact Person of FP (Secondary) naveen@enkingint.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Bingöl Landfill Gas to Electricity Project, developed by the ITC-KA Enerji Üretim Sanayi ve Ticaret A.Ş.” (hereinafter referred to as the “project owner”) is located at the Bingöl landfill site in Bingöl Province of Turkey. The landfill receives the waste of approximately 242,000 people living in Merkez,Genç, Solhan, Arakonak and Ilıcalar Districts of the  Bingöl Municipalities. It is estimated that the landfill received around 711,764 tons of municipal solid waste (MSW) till the operationalization of the project activity in 2019. Approximately 62.55% of this waste consists of organic materials like pulp, paper & cardboard, food waste, garden waste and other organic waste. The average daily amount of waste landfilled is estimated to be around 279 ton/day between the years 2012 and 2019 and 227 ton/day between 2019-2029. The objective of the project activity is to reduce/limit the environmental impacts from the existing and future land filled waste. The project activity includes implementation of a Land Fill Gas (LFG) extraction and utilization system for the purpose of power generation. Successful implementation of this project activity is considered viable with the revenue from carbon financing.

Additional Information

The annual estimated emission reductions for the project activity is 17,624  tCO2e.