Project Submission No. | S00540 |
---|---|
Project Title | Ülkün-2 HPP |
Project Owner(s) (as per PSF & LOA) | 1) Turka Otelcilik Turizm ve Ticaret A.Ş. 2) Sekans Enerji Ltd.Şti. |
Submission Date | 2022-04-10 |
Global Stakeholder Consultation Period |
2022-10-23 to 2022-11-06 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | CDM Approved AMS-I.D. Grid-connected renewable electricity generation, version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 9,437 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Sekans Enerji Limited Sirketi |
Email of Contact Person of FP (Primary) | sila@sekansdanismanlik.com |
Email of Contact Person of FP (Secondary) | deniz@sekansdanismanlik.com |
Name of Authorized External Representative Organization | SEKANS ENERJİ LTD.ŞTİ |
Name of Focal Point of External Representative | SILA DURAN |
Email-id of External representative | sila@sekansdanismanlik.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Ülkün-2 Hydroelectric Power Plant has been developed by Turka Otelcilik Turizm ve Ticaret A.Ş. The project area is located in Çorum Province, Bayat Town, Sağpazar Village. The project consists of 2 units, each having 6.835 MWm/6.545 MWe. Total installed capacity is 13.67 MWm/13.09 MWe. Annual electricity production is expected to be 16,540 MWh according to the generation license. |
---|