PROJECT DETAILS

Project Submission No. S00188
Project Title Atakale Wind Power Plant
Project Owner (as per PSF & LOA) 1. Atakaleres Elektrik Üretim A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Project Representative)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) kazim.safak@ataseven.com.tr
Country Türkiye
Submission Date 7 Apr 2022
Global Stakeholder Consultation Period 21 Apr 2022 - 5 May 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 227,028
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG9, SDG 11, SGD 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Desilyon Danışmanlık Ticaret A.Ş.
Name of Focal Point of External Representative Özlem Özkapı
Email-id of Focal Point ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Atakaleres Elektrik Üretim A.Ş. has constructed the Atakale Wind Power Plant Project. The aim of the project is to produce electrical energy from wind to supply the Turkish national grid. The project includes 23 turbines. Of this, 8 units have 4,5MWm/4.5MWe, one has 4,5MWm/4MWe, and the remaining 14 units have 5,7MWm/5,7MWe with total 120,30 MWm/119,80 Mwe installed capacity. Annual electricity production is expected to be 419,300,000 kWh according to the generation license. The project will be able to deliver a reduction in emissions of around 227,028 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 2,270,280 tonnes of CO2 are expected to be reduced.

Additional Information