PROJECT DETAILS

Project Submission No. S00183
Project Title Yahşelli Wind Power Plant
Project Owner(s) (as per PSF & LOA) Gökteperes Elektrik Üretim A.Ş.
Submission Date 2022-04-07
Global Stakeholder Consultation Period 2022-04-20 to
2022-05-04
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 51,134
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Name of Authorized External Representative Organization Desilyon Danışmanlık Ticaret A.Ş.
Name of Focal Point of External Representative Serkan Korkmaz
Email-id of External representative serkan.korkmaz@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Gökteperes Elektrik Üretim A.Ş. has constructed the Yahşelli Wind Power Plant Project. By means of reducing dependency to the fossil fuels, environmental pollution is significantly reduced. Also, clean energy is generated by using wind power. Regarding to this, Gökteperes Elektrik Üretim A.Ş. constructed a wind power plant in Menemen district, İzmir province, Turkey. Based on the applied tool, the project boundary is considered as the National Electricity Grid of Turkey. The baseline scenario refers to the energy generation from the fossil fuels. The project includes 6 turbines. 5 of them have 3.6 MWm / 3.34 MWe installed capacity, and other turbine has 3.6 MWm / 3.3 MWe and they have total 21.6 MWm / 20 MWe installed capacity. Annual electricity production is expected to be 80,000,000 kWh according to the generation license. The project will be able to deliver an average reduction in emissions of around 51,134 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 511,340 tonnes of CO2e are expected to be reduced.