Project Submission No. | S00183 |
---|---|
Project Title | Yahşelli Wind Power Plant |
Project Owner(s) (as per PSF & LOA) | Gökteperes Elektrik Üretim A.Ş. |
Submission Date | 2022-04-07 |
Global Stakeholder Consultation Period |
2022-04-20 to 2022-05-04 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Name of Authorized External Representative Organization | Desilyon Danışmanlık Ticaret A.Ş. |
Name of Focal Point of External Representative | Serkan Korkmaz |
Email-id of External representative | serkan.korkmaz@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Gökteperes Elektrik Üretim A.Ş. has constructed the Yahşelli Wind Power Plant Project. By means of reducing dependency to the fossil fuels, environmental pollution is significantly reduced. Also, clean energy is generated by using wind power. Regarding to this, Gökteperes Elektrik Üretim A.Ş. constructed a wind power plant in Menemen district, İzmir province, Turkey. Based on the applied tool, the project boundary is considered as the National Electricity Grid of Turkey. The baseline scenario refers to the energy generation from the fossil fuels. The project includes 6 turbines. 5 of them have 3.6 MWm / 3.34 MWe installed capacity, and other turbine has 3.6 MWm / 3.3 MWe and they have total 21.6 MWm / 20 MWe installed capacity. Annual electricity production is expected to be 80,000,000 kWh according to the generation license. The project will be able to deliver an average reduction in emissions of around 51,134 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 511,340 tonnes of CO2e are expected to be reduced. |
---|