IMPORTANT UPDATE: We are migrating to GCC 2.0. We have restricted new projects registration and further updates to migrated project. Please visit to GCC 2.0.

PROJECT DETAILS

Project Submission No. S00186
Project Title Geriş Wind Power Plant
Project Owner(s) (as per PSF & LOA) Rüzgar Elektrik Üretim A.Ş.
Submission Date 2022-04-07
Global Stakeholder Consultation Period 2022-04-21 to
2022-05-05
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 25,437
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Rüzgar Elektrik Üretim A.Ş. has constructed Geriş Wind Power Plant Project in Bodrum district, Muğla province, Turkey. The aim of the project is to produce electrical energy from wind to supply to the Turkish national grid.

The project includes 4 units. Each unit has 3 MWm / 2.8 MWe capacity and they have total 12.0 MWm / 11.2 MWe installed capacity. The commissioning date of the project is 30/10/2018. The project complies with the relevant regulations and laws in Turkey. The Geriş Wind Power Plant was constructed by Rüzgar Elektrik Üretim A.Ş. and “EIA is not required" decision was made by the Ministry of Environment and Urbanization on 19/10/2017.

The project activity will reduce greenhouse gas (GHG) emission by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity is 12.0 MWm / 11.2 MWe. The average annual generated energy is expected to be 39,244 MWh and the project will be able to deliver a reduction in emissions of around 25,437 tCO2e (tons of carbon dioxide equivalent) annually. For the entire crediting period, 254,370 tonnes of CO2 are expected to be reduced.