PROJECT DETAILS

Project Submission No. S00186
Project Title Geriş Wind Power Plant
Project Owner (as per PSF & LOA) Rüzgar Elektrik Üretim A.Ş.
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 7 Apr 2022
Global Stakeholder Consultation Period 21 Apr 2022 - 5 May 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 25438
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG9, SDG 11, SDG 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Rüzgar Elektrik Üretim A.Ş. constructed a wind power plant in Bodrum district, Muğla province, Turkey. The project includes 4 units. Total installed capacity is 12.0 MWm / 11.2 MWe. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. The average annual generated energy is expected to be 39,244 MWh and the project will be able to deliver a reduction in emissions of around 25,438 tCO2e (tons of carbon dioxide equivalent) annually.

Additional Information