PROJECT DETAILS

Project Submission No. S00263
Project Title Renewable wind power project in India -1- 008
Project Owner (as per PSF & LOA) M/s ReNew Green Energy Solutions Private Limited
Submission Date 7 Apr 2022
Global Stakeholder Consultation Period 21 Jul 2022 - 4 Aug 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 212,096 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Country India
Focal Point of Project Owners (FP)
M/s/ ReNew Green Energy Solutions Private Limited
Email of Contact Person of FP (Primary) nikunj.nangalia@renewpower.in
Email of Contact Person of FP (Secondary) prabhat@renewpower.in
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The Project Activity is the installation of a new grid-connected 100.8 MW wind power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project is implemented in Andhra Pradesh state of India.

The electricity generated from Project Activity is connected to the Indian grid. The project activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) associated with equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel based) and from addition of new generation sources into the grid.

Additional Information

The project shall result in replacing anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 2,120,960 tCO2 throughout the crediting period of 10 years i.e. 212,096 tCO2/year, thereon displacing 227,816 MWh/ year amount of electricity from the grid.

VERIFICATION OUTCOME
Opinion

LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “Renewable wind power project in India -1- 008”. The verification is performed on the basis of GCC criteria project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting.

The review of the final version of GCC PSF and the subsequent onsite-audit has provided Applus+ Certification with sufficient evidence to determine the fulfillment of stated criteria. In our opinion, the project meets all relevant GCC project standard requirements for the GCC. The project will hence be recommended by LGAI Technological Center S.A. (Applus+ Certification) for registration with the GCC.

By displacing fossil fuel-based electricity with electricity generated from a renewable source, the project results in reductions of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. Given that the project is implemented as designed, the project is likely to achieve the estimated average annual emission reductions of 212,096 tCO2e per year.

The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1, GCC Project Standard, version 03.1 and on the basis of the contractual agreement.

In detail the conclusions can be summarized as follows:

-         The project does not result in negative social, environmental and/or economic impacts.

-         The project contribution to Environment, Social Development and Economic and technological development

-         The project additionality is sufficiently justified in the GCC PSF.

-         The Project has correctly described the Project Activity in the Project Submission Form including the applicability of the approved methodology ACM0002, version 21.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

 

-         The Project is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and

-         Conservative assumptions were applied in the project description.

-         The monitoring plan of SDG parameters is transparent and adequate.

-         The project meets the local stakeholder consultation requirements.

The conclusions of this report show, that the project, as it was described in the project documentation, is in line with all criteria applicable for the verification.

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2023-07-20