PROJECT DETAILS

Project Submission No. S00156
Project Title 2M Solar Power Plant Bundle
Project Owner (as per PSF & LOA) 1.2M Enerji Üretim A.Ş. & 2.Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Submission Date 28 Mar 2022
Global Stakeholder Consultation Period 5 Apr 2022 - 19 Apr 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 8,992 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Country Türkiye
Focal Point of Project Owners (FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

2M Solar Power Plant Bundle Project consists of 7 individual Unlicensed Solar Power Plants with a capacity of 6.93 MWe / 8.162 MWp in total, which is formed according to the Law no: 6446 on Electricity Market Law. Solar panels, inverters and power transmission lines were intended to be built on an area of 700,000 m2 in Kütahya and Bilecik. The purpose of the project is to generate clean energy by using the solar power and providing the energy to the Turkish national grid. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity is 6.93 MWe. The average annual generated energy is expected to be 13,860 MWh and the project will be able to deliver a reduction in emissions of around 8,992 tCO2e (tons of carbon dioxide equivalent) per annual. For the entire crediting period, 89,920 tonnes of CO2 are expected to be reduced.

Additional Information
VERIFICATION OUTCOME
Opinion

4K Earth Science Private Limited has been contracted by ‘Desilyon Danışmanlık Ticaret A.Ş’ to undertake verification of the project activity “2M Solar Power Plant Bundle” in Türkiye. The verification was performed based on rules and requirements defined by GCC for the project activity.

The project activity is a solar power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring AMS-I.D version 18.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms. 

The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 8,992 tCO2e/year over the 10 years crediting period starting from 10/03/2017.

4K Earth Science Private Limited has verified and hereby certifies that the GCC Project Activity “2M Solar Power Plant Bundle”:

·        has correctly described the Project Activity in the Project Submission Form (version 2.2, dated 04/04/2023) including the applicability of the approved methodology AMS-I.D, version 18.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

·        is likely to generate GHG emission reductions amounting to the estimated 89,920 tCO2eq over the crediting period, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and therefore requests the GCC Program to register the Project Activity  

·        is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and

·        is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 05 SDGs, which is likely to achieve the Platinum SDG certification label (SDG+).

·        The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.2 paragraph 21-23, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project

·        is likely to contribute to CORSIA Eligible Emission Units and has CORSIA Label (C+) certification valid till 31 December 2020. A written attestation from the Host country on double counting is not required until 31 December 2020 and the project was found meeting the applicable requirements prescribed by ICAO.

Report (Public) Verification Report (public)
Verification report date
First Request for Registration Date 2023-04-04
© 2024 Global Carbon Council