Project Submission No. S00197
Project Title Wind Power Project in Thatta, Sindh by Liberty Wind Power 1 Limited
Project Owner(s) (as per PSF & LOA) Liberty Wind Power 1 Limited
Submission Date 2022-03-25
Global Stakeholder Consultation Period 2022-04-24 to
2022-05-08
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 95,686
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Diamond
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Pakistan
Focal Point of Project Owners
Emergent Ventures India Pvt. Ltd.
Email of Contact Person of FP (Primary) atul.sanghal@emergent-ventures.com
Email of Contact Person of FP (Secondary) jatin@emergent-ventures.com
Name of Authorized External Representative Organization Emergent Ventures India Pvt. Ltd.
Name of Focal Point of External Representative Atul Sanghal
Email-id of External representative atul.sanghal@emergent-ventures.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The purpose of project activity is to generate and feed to the connected national electricity grid of Pakistan, GHG free electricity by the installation of wind turbines. The project is implemented with a capacity of 50 MW. The wind project is located in Jhimpir, District Thatta, Sindh Pakistan.

The project boundary includes the project sites where the wind turbines have been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs.

The baseline of the project activity is continued generation of electricity in the connected national grid in Pakistan. The electricity generation in Pakistan is highly carbon intensive. According to the latest data from Pakistan Energy Yearbook, published by ministry of energy on carbon intensity of grid electricity, the combined margin emission factor of the grid electricity is 0.575 tCO2e/MWh and therefore electricity generation from wind energy project as in the project activity results into emission reductions. It is estimated that the project activity will effect a cumulative GHG emission reduction of 956,863 tCO2e over 10 year period of project activity with average annual reduction of 95,686 tCO2e and average electricity generation of 166,440 MWh per year.