Project Submission No. | S00274 |
---|---|
Project Title | Renewable Wind Power Project in Gujarat by CGEIPL 1 |
Project Owner (as per PSF & LOA) | Trinethra Wind and Hydro Power Private Limited, Continuum Green Energy (India) Private Limited (to act as Project Owner) |
Focal Point of Project Owners*(FP)
|
CONTINUUM GREEN ENERGY (INDIA) PVT LTD |
Email of Contact Person of FP (Primary) | vr.ramesh@continuumenergy.in |
Email of Contact Person of FP (Secondary) | regulatory@continuumenergy.in |
Country | India |
Submission Date | 17 Mar 2022 |
Global Stakeholder Consultation Period | 27 Jul 2022 - 10 Aug 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 329,924 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 1,5,7,8,9,11,13 |
Forecasted SDG+ Label | Diamond |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The project activity is a new grid-connected 101.2 MW wind power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project is implemented in Gujarat state of India by one Special Purpose Vehicle (SPV) viz. Trinethra Wind and Hydro Power Private Limited .
The electricity generated from project activity is exported to the Indian grid in India through a PPA there by displacing the consumption of electricity from the regional grid electricity distribution system.
The electricity generated by the project activity thus replaces the equivalent amount of electricity generated by the operation of existing/ grid connected power plants (mostly fossil fuel based power plants) and by addition of new generation sources into the grid and hence leads to reduction of anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel) and by addition of new generation sources into the grid. |
---|---|
Additional Information | The annual estimated emission reductions for the project activity are 329,924 tCo2e. |