PROJECT DETAILS

Project Submission No. S00190
Project Title Şavşat Regulator and Hydroelectric Power Plant
Project Owner (as per PSF & LOA) 1. 2M Enerji Üretim A.Ş. 2.Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 15 Mar 2022
Global Stakeholder Consultation Period 21 Apr 2022 - 5 May 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 27,965
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Şavşat Regulator and Hydroelectric Power Plant includes 2 units (turbines) where one of them has 8,300 MWm / 7,260 MWe installed capacity. The total installed capacity of the plant is 16,600 MWm / 14,520 MWe. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. The average annual generated electricity is expected to be 49,010 MWh according to the generation license and the emission reduction is estimated around 27,965 tCO2 annually. For the entire crediting period, 279,651 tCO2 are expected to be reduced.

Additional Information