Project Submission No. | S00172 |
---|---|
Project Title | Güce Hydro Power Plant |
Project Owner (as per PSF & LOA) | 1. Güce Tekkeköy Enerji Üretim San ve Tic. A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners) |
Submission Date | 14 Mar 2022 |
Global Stakeholder Consultation Period | 13 Apr 2022 - 27 Apr 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 25,414 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Country | Türkiye |
---|---|
Focal Point of Project Owners (FP)
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Güce Hydro Power Plant has been developed by Güce Tekkeköy Enerji Üretim A.Ş. The project area is located in Giresun Province, Güce District. The project consists of 2 units each having 6.62 MWm /6.355 MWe. The total installed capacity is 13.24 MWm / 12.71 MWe. Annual electricity production is expected to be 44.540 GWh according to the generation license. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emissions from electricity generation by fossil fuel power plants connected to the Turkish National Power Grid. The average annual generated energy is expected to be 44,540 MWh according to the generation license and the project will be able to deliver a reduction in emissions of around 25,414 tCO2e (tons of carbon dioxide equivalent) annually. |
---|---|
Additional Information |
Opinion | 4K Earth Science Private Limited has been contracted by ‘Desilyon Danışmanlık Ticaret A.Ş.' to undertake verification of the project activity Güce Hydro Power Plant in Turkey. The verification was performed based on rules and requirements defined by GCC for the project activity. |
---|---|
Report (Public) | Verification Report (public) |
Verification report date | |
First Request for Registration Date | 2023-04-11 |