PROJECT DETAILS

Project Submission No. S00172
Project Title Güce Hydro Power Plant
Project Owner (as per PSF & LOA) 1. Güce Tekkeköy Enerji Üretim San ve Tic. A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Türkiye
Submission Date 14 Mar 2022
Global Stakeholder Consultation Period 13 Apr 2022 - 27 Apr 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 25,415
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Güce Hydro Power Plant has been developed by Güce Tekkeköy Enerji Üretim A.Ş.. The project area is located in Giresun Province, Güce District. The project consists of 2 units each having 6.62 MWm /6.355 MWe. The total installed capacity is 13.24 MWm / 12.71 MWe. Annual electricity production is expected to be 44.540 GWh according to the generation license. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emissions from electricity generation by fossil fuel power plants connected to the Turkish National Power Grid. The average annual generated energy is expected to be 44,540 MWh according to the generation license and the project will be able to deliver a reduction in emissions of around 25,415 tCO2e (tons of carbon dioxide equivalent) annually.

Additional Information