PROJECT DETAILS

Project Submission No. S01259
Project Title 6.804 MW (AC) Grid-Connected Solar PV Project by Abdali Clemenceau Renewable Energy
Project Owner(s) (as per PSF & LOA) Abdali Clemenceau Renewable Energy
Submission Date 2022-03-09
Global Stakeholder Consultation Period 2024-06-30 to
2024-07-14
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version A2
Forecasted GHG Emission Reduction (tCO2e/Year) 6,035
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Jordan
Focal Point of Project Owners
ahmad.abughazaleh@abdalimedical.com
Email of Contact Person of FP (Primary) ahmad.abughazaleh@abdalimedical.com
Email of Contact Person of FP (Secondary) mag2022@gmail.com
Name of Authorized External Representative Organization Abdali Medical Center Company
Name of Focal Point of External Representative Ahmad Mohammed Ahmad Abu Ghazaleh
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The objective of this project is to produce electricity through the utilization of solar photovoltaic technology and supplying the generated electricity to the Abdali Medical Center Company through the national grid with wheeling. The project scope encompasses the solar installation, transformers, substation facilities, energy meters, the power grid, and the designated consumers. This project operates as a wheeling system, producing electricity and exporting it to the grid, from which the electricity company then delivers it to the project owner.

The project is set to counteract anthropogenic emissions of greenhouse gases (GHGs) that are estimated to reach around 6,035 metric tons of CO2 equivalent per year. By doing so, it will displace an estimated average of 12,73413 megawatt-hours per year from the electricity generation mix of power plants connected to the Jordanian grid, which is predominantly comprised of thermal and fossil fuel-based power plants. Over the full crediting period of 10 years, from 27/08/2019 to 26/08/2029, the project's activities are expected to result in a total reduction of 60,359 metric tons of CO2 equivalent in GHG emissions.