PROJECT DETAILS

Project Submission No. S00165
Project Title Esentepe Regulator and Hydroelectric Power Plant
Project Owner (as per PSF & LOA) 1.Bahser Enerji Elektrik Üretim San. A.Ş. 2. Desilyon Danışmanlık Ticaret A.Ş. (Focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Türkiye
Submission Date 7 Mar 2022
Global Stakeholder Consultation Period 12 Apr 2022 - 26 Apr 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 25,500
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Esentepe Regulator and Hydroelectric Power Plant includes 2 units which are Irmak and Oğlaklı Regulator where each one has 8.10 MWm / 7.94 MWe installed capacity. The total installed capacity of the plant is 16.20 MWm / 15.88 MWe. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. The total installed capacity of the plant is 16.20 MWm / 15.88 MWe. The average annual generated electricity is expected to be 44,690 MWh according to the generation license and the emission reduction is estimated around 25,500 tCO2 annually. For the entire crediting period, 255,001 tCO2 are expected to be reduced.