Project Submission No. | S00164 |
---|---|
Project Title | Wind Power Project in Jamshoro, Sindh by Master Green |
Project Owner(s) (as per PSF & LOA) | Master Green Energy Limited |
Submission Date | 2022-03-06 |
Global Stakeholder Consultation Period |
2022-04-11 to 2022-04-25 |
Registration Date | 2025-04-07 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Verified GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Verified SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Verified SDG+ Label | Silver |
Forecasted Market Eligibility | |
Verified Market Eligibility |
Location Details
Open Full Map
|
|
Country |
Pakistan
|
---|---|
Focal Point of Project Owners
|
Emergent Ventures India Pvt. Ltd. |
Email of Contact Person of FP (Primary) | atul.sanghal@emergent-ventures.com |
Email of Contact Person of FP (Secondary) | jatin@emergent-ventures.com |
Name of Authorized External Representative Organization | Emergent Ventures India Pvt. Ltd. |
Name of Focal Point of External Representative | Atul Sanghal |
Email-id of External representative | atul.sanghal@emergent-ventures.com |
Project Verifier | KBS CERTIFICATION SERVICES PVT. LTD. |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Brief | The purpose of project activity is to generate and feed to the connected national electricity grid of Pakistan, GHG free electricity by the installation of 25 wind turbines of 2MW each. The total capacity of the wind power plant is 50MW. The wind project is located at North-East of Karachi in Goth Dehson Walhar District Jamshoro, Sindh Pakistan. The project boundary includes the project sites where the wind turbines have been installed, power evacuation infrastructure including the other power stations feeding to the connected electricity grid, energy metering points, switch yards and other civil constructs. The baseline of the project activity is continued generation of electricity in the connected national grid in Pakistan. The electricity generation in Pakistan is highly carbon intensive. According to the latest data from Pakistan Energy Yearbook, published by ministry of energy on carbon intensity of grid electricity, the combined margin emission factor of the grid electricity is 0.575 tCO2e/MWh and therefore electricity generation from wind energy project as in the project activity results into emission reductions. It is estimated that the project activity will effect a cumulative GHG emission reduction of 968,950 tCO2e over 10 year period of project activity with an average of 96,895 tCO2e GHG emission reduction per year and an average of 168,542 MWh electricity generation per year. |
---|
Report (Public) | Verification Report (public) |
---|---|
Verification report date | 2025-03-31 |
First Request for Registration Date | 2023-01-02 |
Opinion | The GCC Project Verifier, KBS Certification Services Pvt. Ltd., has verified and certified that the GCC Project Activity – ‘Wind Power Project in Jamshoro, Sindh by Master Green’ has correctly described the Project Activity in the Project Submission Form (version 1.3 dated 14/12/2022 including the applicability of the approved methodology ACM0002, version 20.0. and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; is likely to generate GHG emission reductions amounting to the estimated annual average ACCs of up to 96,895 tCO2e and a total of 968,950 tCO2e ACCs over 10-year period. the project activity complies with all applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.2 paragraph 21-23, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA, therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project, including ISO 14064-2 and ISO 14064-3 and therefore requests the GCC Program to register the Project Activity; is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard/6/, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs) comply with the Project Sustainability Standard, and contribute to achieving a total of 6 SDGs, which is likely to achieve the Diamond SDG certification label (SDG+). |