PROJECT DETAILS

Project Submission No. S00307
Project Title İstanbul Wind Power Plant
Project Owner (as per PSF & LOA) Universal Wind Elektrik Üretim A.Ş.
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 2 Mar 2022
Global Stakeholder Consultation Period 14 Aug 2022 - 28 Aug 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 453,740
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 11, SDG 13
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Desilyon Danışmanlık Ticaret A.Ş.
Name of Focal Point of External Representative Desilyon Danışmanlık Ticaret A.Ş.
Email-id of Focal Point ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Universal Wind Elektrik Üretim A.Ş. has constructed the İstanbul Wind Power Plant Project. The aim of the project is to produce electrical energy from wind for the Turkish national grid. Universal Wind Elektrik Üretim A.Ş. constructed a wind power plant in Çatalca district, İstanbul province, Turkey. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emissions from electricity generation by fossil fuel power plants connected to the Turkish National Power Grid. The total installed capacity is 200 MW. The average annual generated energy is expected to be 700,000 MWh and the project will be able to deliver a reduction in emissions of around 453,740 tCO2e (tons of carbon dioxide equivalent) annually. 