PROJECT DETAILS

Project Submission No. S00123
Project Title 38 MW Wind Power Project of Four EF Renewables Private Limited
Project Owner (as per PSF & LOA) Four EF Renewables Private Limited
Focal Point of Project Owners*(FP)
Kosher Climate India Private Limited
Email of Contact Person of FP (Primary) narendra@kosherclimate.com
Email of Contact Person of FP (Secondary) Triveni.yadav@ampyrenergy.com
Country India
Submission Date 2 Mar 2022
Global Stakeholder Consultation Period 6 Mar 2022 - 20 Mar 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0
Forecasted GHG Emission Reduction(TCO2/Year) 129,233
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7,8, and 13
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Kosher Climate India Private Limited
Name of Focal Point of External Representative Narendra Kumar Ramraj
Email-id of Focal Point Narendra@kosherclimate.com
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The Purpose of this project activity is to generate electricity by harnessing the wind energy by using
of Wind Turbine technology and there by feed the generated electricity to the Indian national grid.
Project activity involves installation of 38 MW Wind Power Project in Chellakere Taluk and
Chitradurga taluks of Chitradurga district of Karnataka state in India. The project activity involves
installation of 19 numbers of Gamesa G114 Model 2000 KW WTGS with a total capacity of 38 MW.
The project is implemented by Four EF Renewables Private Limited, proposed project is connected
to the Indian national grid through 66/11 kV KPTCL substation located at Balenahalli village through
66/33kV Wind farm pooling substation located at Dyamavvanahalli village.

Additional Information